工程项目物资JIT管控准时率评价研究
The Research on JIT Control Evaluation System of Project Material
DOI: 10.12677/SG.2014.45026, PDF, HTML,  被引量 下载: 2,447  浏览: 5,987  国家科技经费支持
作者: 左小德, 刘思远:暨南大学管理学院,广州;余晓峰, 李 杨:中国S电网集团有限公司物资部,广州
关键词: 项目物资管控准时率评价方法JITProject Material Control On-Time Rate Evaluation Methodology JIT
摘要: 电力工程项目物资JIT(Just in Time)管控,将JIT思想带入到了工程建设过程中,保证了项目物资的准时送达,提升了项目的整体效益。但是目前企业施行的工程项目JIT管控仍处于初级阶段,其相对应的准时率评价也不完善。本文在分析评价指标体系构建的基础上,结合实际情况,设计科学合理的准时率评价方法,并以S电网公司的实际数据为算例,验证评价方法的可行性。
Abstract: Project supplies JIT (Just in Time) controls, bring JIT thoughts to the project construction process to ensure the on Time delivery of project materials, and promote the overall benefits of the project. But at present, the enterprise’s JIT project control is still in its infancy, so its corresponding evalu-ation on time rate is not perfect. Based on the analysis of the construction of the evaluation index system principles and combined with the actual situation, the article designs a scientific and rea-sonable evaluation method on time rate, and takes the real data of South Power Grid Corp for ex-ample, to verify the feasibility of the evaluation method.
文章引用:左小德, 余晓峰, 李杨, 刘思远. 工程项目物资JIT管控准时率评价研究[J]. 智能电网, 2014, 4(5): 175-179. http://dx.doi.org/10.12677/SG.2014.45026

参考文献

[1] 程坤 (2010) 工程项目物资采购管理模式研究. 电子科技大学硕士学位论文.
[2] 廖令, 李华新 (2012) 工程项目物资管理中成本控制的研究. 科技创新与应用, 3, 236-237.
[3] 韦鸿钰, 廖小平, 邓建新, 黄鑫 (2007) JIT采购模式在ERP系统中的研究与应用. 机械设计与制造, 4, 179-181.
[4] 宋莹, 乐德林, 谢琼 (2011) 浅析汽车制造企业生产物流JIT配送系统. 物流技术, 13, 170-172.
[5] 王静静 (2009) JIT采购模式在企业中的应用. 管理观察, 11, 117-118.
[6] 刘丽文 (2006) 生产与运作管理. 清华大学出版社, 北京.
[7] 曹翠珍 (2004) JIT生产方式的精髓和实施条件. 经济问题, 11, 46-47.
[8] 孙晓波 (2010) JIT的管理哲学借鉴与思辨. 物流科技, 7, 45-47.
[9] 左涛, 王道平 (2005) 企业信息化效益的多阶段评价. 科技和产业, 11, 27-30.