生产建设项目防治指标与措施配置关系的研究
Research on the Relationship between Control Index of Development and Construction Projects and Measure Allocation
DOI: 10.12677/AEP.2014.46B005, PDF, HTML, 下载: 2,347  浏览: 6,041 
作者: 董飞飞, 康玲玲*:1黄河水利委员会黄河水利科学研究院,郑州 2水利部黄土高原水土流失过程与控制重点实验室,郑州
关键词: 生产建设项目防治指标措施配置Development and Construction Projects Control Index Measure Allocation
摘要:

本文在分析了生产建设项目防治措施布设原则的基础上,分析了影响防治目标达到因子,并对防治目标、防治指标、效益分析与措施配置关系进行了研究,提出防治目标是水土保持方案措施配置后必须达到的最低要求,效益分析是根据水土保持方案措施配置能够达到的防治指标,措施配置是达到防治目标的方法。

This article based on the analysis of the development and construction projects for control measures layout principle, analyzed the influence factor of the control goal, and researched control goal, control index, benefit analysis and measure allocation relation. It puts forward that control goal is the minimum requirement plan of soil and water conservation measures. Benefit analysis is control index to achieve the plan of soil and water conservation measures, and measures allocation is method to achieve control goal. 

文章引用:董飞飞, 康玲玲. 生产建设项目防治指标与措施配置关系的研究[J]. 环境保护前沿, 2014, 4(6): 34-39. http://dx.doi.org/10.12677/AEP.2014.46B005