桥梁顶升限位防护体系设计与安全性分析
Design and Safety Analysis of Block Protection System for Bridge Lifting Construction
DOI: 10.12677/HJCE.2016.53011, PDF, HTML, XML, 下载: 1,838  浏览: 6,490  科研立项经费支持
作者: 年福龙*:上海城投航道建设有限公司,上海
关键词: 桥梁顶升限位装置承载力分析桥墩Bridge Lifting Limiting Protection System Analysis of Bearing Capacity Bridge Pier
摘要: 在桥梁墩柱附近设置限位装置是桥梁顶升施工中的重要安全措施之一。然而受桥梁结构和墩柱布置的影响,实际限位装置的设置受到限制。本文结合实际工程顶升施工中的限位防护体系的设计,开展了相应的设计优化,并进行了安全性承载力分析,保证了背景工程的顶升施工安全。
Abstract: The installation of block protection system near the bridge pier is one of the most important safety precautions in the construction of bridge lifting construction. However, due to the influence of the structure of the bridges and arrangement of the piers, the setting of the protection system is difficult to carry out. In this paper, the optimized design based on the protection system in the lifting construction of the actual project is carried out and the safety bearing capacity is analyzed, which ensured the construction safety of the actual project.
文章引用:年福龙. 桥梁顶升限位防护体系设计与安全性分析[J]. 土木工程, 2016, 5(3): 79-85. http://dx.doi.org/10.12677/HJCE.2016.53011

参考文献

[1] 中交第一公路勘察设计研究院. 公路桥梁加固设计规范(JTG/T J22-2008) [S]. 北京: 人民交通出版社, 2008.
[2] 韩金豹. 大跨混凝土连续箱型桥梁整体顶升关键技术研究[D]: [硕士学位论文]. 上海: 同济大学, 2012.
[3] 蒋岩峰, 蓝戊已. 桥梁整体顶升关键技术研究[J]. 建筑结构, 2007, 37(S1): 547-549.
[4] 蓝戊己, 张志军, 顾远生, 等. 南浦大桥东主引桥整体同步顶升工程[J]. 城市道桥与防洪, 2009(10): 22-25, 135.
[5] 白云, 沈水龙. 建(构)筑物移位技术[M]. 北京: 中国建筑工业出版社, 2006.
[6] Nai, D.G., Van Lam, N. and Duc, D.V. (2003) Re-search and Application of Bridge Beam Raising Technology by Force Resistance Steel Pipes to Replace Bearing in Normal Traffic Conditions. Proceedings of the Eastern Asia Society for Transportation Studies, 4, 1779-1786.
[7] Seo, J., Yoo, W.S., Lee, U.K., Kim, C., Kang, K.I. and Cho, H. (2010) Case Study of a Synchronous Hydraulic Jack-Up System for Constructing High-Rise Residential Buildings. Canadian Journal of Civil Engineering, 37, 922- 926. http://dx.doi.org/10.1139/L10-026
[8] Tan, X.M., Li, J. and Lu, C. (2003) Structural Behaviour Prediction for Jack-Up Units during Jacking Operations. Computers & Structures, 81, 2409-2416. http://dx.doi.org/10.1016/S0045-7949(03)00299-2
[9] Li, F.Y., Wu, P.F. and Yan, X.F. (2015) Analysis and Monitoring on Jacking Construction of Continuous Box Girder Bridge. Computers and Concrete, 16, 49-65. http://dx.doi.org/10.12989/cac.2015.16.1.049
[10] 金恩. 大跨径连续梁桥顶升过程中的桥墩受力分析[J]. 中国市政工程, 2011(2): 75-77.
[11] 上海市城市建设设计研究院. 同三国道跨横潦泾大桥改造工程设计图纸[Z], 2010.