49 m法兰连接式火炬整体吊装有限元校核分析
FEM Simulation on Integral Hoisting for 49 m Flange Connection Flare Stack Structure
DOI: 10.12677/MET.2016.53033, PDF, HTML, XML, 下载: 1,883  浏览: 5,037 
作者: 李化钊:大庆油田基建管理中心,黑龙江 大庆;盛选禹:清华大学核能与新能源技术研究院,北京;徐雅晨*:清华大学天津高端装备研究院先进能源装备技术研究所,天津
关键词: 法兰连接火炬塔架整体吊装CATIA有限元分析加固Flange Connection Flare Stack Integral Hoisting CATIA Finite-Element-Analysis Strengthen
摘要: 法兰连接结构火炬塔架安装一般采用散件组装或分节吊装,由于施工条件苛刻本文提出一种法兰连接式火炬塔架一次性整体吊装技术方法的创新。使用CATIA有限元分析模拟火炬塔架整体吊装时的水平和竖直两个极限状态工况受力,对吊装时塔架的强度和稳定性进行校核计算,查找出危险点及提出薄弱结构的加固处理措施,为吊装工艺设计提供依据。
Abstract: Knocked down assembly or segmentation hoisting is generally used for flare stack with flange connection structure. This paper presents a novel technology of integral hoisting of flare stack with flange connection structure. In the paper, CATIA finite-element-analysis is used to build the model of flare stack and to simulate working condition in both horizontal and vertical limit states during integral hoisting of flare stack. The strength and stability of flare stack during hoisting is checked and calculated. The dangerous points and weak structures are conducted through the reinforcement treatment to provide evidence for hoisting procedure design and formulation of hoisting plan.
文章引用:李化钊, 盛选禹, 徐雅晨. 49 m法兰连接式火炬整体吊装有限元校核分析[J]. 机械工程与技术, 2016, 5(3): 278-286. http://dx.doi.org/10.12677/MET.2016.53033