城市轨道交通预制短板轨道的实验方案设计与分析
Design and Analysis of In-Door Experiments of Prefabricated Short Slab Track in Urban Rail Transit
DOI: 10.12677/OJTT.2016.56021, PDF, HTML, XML, 下载: 1,832  浏览: 4,647 
作者: 程曜彦:同济大学道路与交通工程教育部重点实验室,上海
关键词: 城市轨道交通浮置板预制短板轨道试验分析Urban Rail Transit Floating Slab Track Prefabricated Short Slab Track Experiment Analysis
摘要: 预制短板节段拼装方案的浮置板轨道有效克服了常规钢弹簧浮置板轨道结构施工进度慢、施工方式受限等问题而得到推广。但结构上的这种变化引起其在列车荷载作用下受力特征和力学状态的改变,进而影响到轨道结构的强度安全、稳定性以及使用寿命。本文结合室内试验需求和目标,对预制短板轨道的室内试验方案设计、数据分析方法和典型测试结果等做一简要的介绍。
Abstract: The floating slab track of the prefabricated short slab installation solution effectively overcomes the defects such as time-consuming in construction and limiting the methods of construction, and so they are widely used. But those changes in structures cause the change of force characteristics and mechanics status under the train loads, and affect their strength safety, stability and service life. Combing the in-door experiments’ requirement and objectives, the design of the experiments solutions to the prefabricated slab track, data analysis method and typical measurement result etc. are introduced briefly in this paper.
文章引用:程曜彦. 城市轨道交通预制短板轨道的实验方案设计与分析[J]. 交通技术, 2016, 5(6): 166-173. http://dx.doi.org/10.12677/OJTT.2016.56021

参考文献

[1] Cox, S.J. and Wang, A. (2003) Effect of Track Stiffness on Vibration Levels in Railway Tunnels. Journal of Sound and Vibration, 267, 565-553.
http://dx.doi.org/10.1016/S0022-460X(03)00724-7
[2] Liang, G., Yin, K.-M. and Zhang, G.-Y. (2006) Study on Dynamics Characteristics of Concrete Floating Slab Track in Urban Track. Key Engineering Materials, 302-303, 700-705.
http://dx.doi.org/10.4028/www.scientific.net/KEM.302-303.700
[3] 贾嘉陵, 李晓霖. 地铁列车不同轨道参数的减振效果分析[J]. 中国安全科学学报, 2003, 13(11): 66-72.
[4] 练松良, 刘加华. 城市轨道交通减振降噪型轨道结构的选择[J]. 城市轨道交通研究, 2003, 6(3): 35-41.
[5] 焦金红, 黄俊飞, 周宇. 减振降噪型轨下基础——浮置板轨道结构[J]. 都市快轨交通, 2002(4): 29-31.
[6] 焦金红, 张苏, 耿传智, 谭复兴. 轨道结构的减振降噪措施[J]. 城市轨道交通研究, 2002, 5(1): 61-66.