华电集团投资海外燃煤电厂生产准备优化探索与实践
Optimization of Exploration and Practice of Production for the Huadian Group of Foreign Investment in Coal-Fired Power Plant
DOI: 10.12677/CCE.2016.43003, PDF, HTML, XML, 下载: 1,781  浏览: 4,466 
作者: 程彦林:中国华电集团发电运营有限公司,北京
关键词: 华电集团投资海外燃煤电厂生产准备优化Huadian Group of Investment Overseas Coal-Fired Power Plant Production Preparation Optimization
摘要: 生产准备是为保证基建生产的无缝连接和平稳过渡,达到设计标准顺利投入生产,投产后能稳定高效运行而所作的一切必要的准备工作。电站的建设(包括扩建),必须经历由前期准备到项目立项,设计施工、安装调试、试运行到正式投产发电的一系列阶段。生产准备工作必须以明快、可操、实用、效益为主线,实现基建生产的无缝连接和平稳过渡。本文针对华电集团在海外投资燃煤电站的特点,对生产准备工作中常见问题进行了分析,然后结合东道国实际,对生产准备进行优化,可为同类型燃煤电站生产准备提供参考。
Abstract: Production preparation is to ensure the smooth transition of the seamless connection of the pro-duction of capital construction, to achieve the smooth operation of the design standards, and the stable and efficient operation of the production, doing all necessary preparations for the work. Power plant construction (including expansion), must go through the preparation of the project to the project, the design and construction, installation and commissioning, commissioning and commissioning of a series of stages of power generation. Production preparation work must be bright and can be operational, practical, benefit as the main line to achieve seamless connection and stable transition of capital construction production. According to the characteristics of Huadian Group of overseas investment in coal-fired power plants, common problems of production preparation work are analyzed, and then combined with the actual production of the host country, to optimize for the same type of coal-fired power plant production ready to provide reference.
文章引用:程彦林. 华电集团投资海外燃煤电厂生产准备优化探索与实践[J]. 清洁煤与能源, 2016, 4(3): 17-23. http://dx.doi.org/10.12677/CCE.2016.43003