基于梯级水库常规调度图的优化绘制
The Optimizing Drawing of Cascade Reservoirs Operation Chart Based on the Routine Operation
DOI: 10.12677/JWRR.2012.16066, PDF, HTML, 下载: 3,047  浏览: 8,017  国家自然科学基金支持
作者: 杨元园, 黄 强, 王义民:西安理工大学,西北旱区生态水利工程国家重点实验室培育基地
关键词: 梯级水库调度图优化离散微分动态规划Cascade Reservoirs; Operation Chart; Optimization; Discrete Differential Dynamic Programming
摘要: 水库调度图作为指导水电站安全高效运行的依据,一直是水库调度研究的热点,然而现有研究大多以单库调度图为对象进行优化,或是基于中长期发电优化调度模型绘制梯级水库调度图。单库优化调度图较难满足梯级调度要求,而后者虽然理论成熟、应用广泛,但存在建模、求解复杂,步骤繁琐,误差较大等的缺点。鉴此,本文提出了一种采用模拟与优化相结合的技术绘制梯级水库优化调度图的实用方法。该法通过直接优化梯级水库常规调度图的调度线,从而获得优化调度图。以乌江流域4座调节性能较好的水库构成的梯级水库为研究对象进行实例分析,模拟调度结果表明较大地提高了梯级长期发电效益,验证了该法的可靠性和有效性,从而为梯级水库优化调度图的绘制提供了新思路。
Abstract: Reservoir operation chart has been a hot topic of the reservoir operation study as a basis for the guidance of the efficient and safe operation of the hydropower station. However, existing studies are mostly studying on the optimizing drawing of single reservoir, or research on the drawing of cascade reservoirs operation chart using a long-term power optimization scheduling model. Single reservoir optimized operation chart is hard to meet the cascade scheduling requirements, while the latter theory is mature, widely used, but has its flaws. For this, this paper puts forward a drawing way of cascade reservoirs optimal operation charts, using the combination technology of simulation and optimization, through the direct optimization of the cascade reservoirs conventional operation curves. For the cascade hydropower stations on the WujiangRiver, simulation scheduling results show considerably increase on the cascade long-term generation benefit. Thus verify the reliability and validity of the method, so as to provide a new idea to draw the cascade reservoirs operation chart.
文章引用:杨元园, 黄强, 王义民. 基于梯级水库常规调度图的优化绘制[J]. 水资源研究, 2012, 1(6): 418-422. http://dx.doi.org/10.12677/JWRR.2012.16066

参考文献

[1] 杨凤英. 梯级水电站群优化调度图研究及应用[D]. 大连理工大学, 2009. YANG Fengying. The study and application for optimal opera- tion chart of cascade reservoirs. Dalian University of Technol- ogy, 2009. (in Chinese)
[2] 谢维, 纪昌明, 李克飞, 等. 金沙江梯级水电站群联合发电运行三种常规调度方法研究[J]. 水力发电, 2011, 8: 81-84. XIE Wei, JI Changming, LI Kefei, et al. Study on three conven- tional scheduling methods for power generation of cascade hy- dropower stations. Water Power, 2011, 8: 81-84. (in Chinese)
[3] 黄强, 张洪波, 原文林, 等. 基于模拟差分演化算法的梯级水库优化调度图研究[J]. 水力发电学报, 2008, 6: 13-17. HUANG Qiang, ZHANG Hongbo, YUAN Wenlin, et al. Study of optimal operation chart of cascade reservoirs based on linking simulation with differential evolution algorithm. Journal of Hy- droelectric Engineering, 2008, 6: 13-17. (in Chinese)
[4] 李玮, 郭生练, 朱凤霞, 等. 清江梯级水电站联合调度图的研究与应用[J]. 水力发电学报, 2008, 5: 10-15. LI Wei, GUO Shenglian, ZHU Fengxia, et al. Combined reser- voirs operation of Qingjiang cascade hydropower stations. Jour- nal of Hydroelectric Engineering, 2008, 5: 10-15. (in Chinese)
[5] 张双虎, 黄强, 黄文政, 等. 基于模拟遗传混合算法的梯级水库优化调度图制定[J]. 西安理工大学学报, 2006, 3: 229-233. ZHANG Shuanghu, HUANG Qiang, HUAGN Wenzheng, et al. Linking simulation with genetic algorithm to establish optimal operation chart of cascade reservoirs. Journal of Xi’an Univer- sity of Technology, 2006, 3: 229-233. (in Chinese)
[6] 程春田, 杨凤英, 武新宇, 等. 基于模拟逐次逼近算法的梯级水电站群优化调度图研究[J]. 水力发电学报, 2010, 6: 71-77. CHENG Chuntian, YANG Fengying, WU Xinyu, et al. Link the simulation with dynamic programming successive approxima- tions to the study on optimal operation chart of cascade reser- voirs. Journal of Hydroelectric Engineering, 2010, 6: 71-77. (in Chinese)
[7] 黄春雷, 吴洪寿, 丁杰, 等. 基于总保证出力协调的梯级水库联合调度图研究[J]. 水电能源科学, 2012, 2: 49-52. HUANG Chunlei, WU Hongtao, DING Jie, et al. Joint operation chart of cascade reservoirs based on total firm power coordinating. Water Resources and Power, 2012, 2: 49-52. (in Chinese)
[8] 张双虎. 梯级水库群发电优化调度的理论与实践[D]. 西安理工大学, 2007. ZHANG Shuanghu. The theory and practise of cascade reservoirs power generation optimized operation. Xi’an University of Technology, 2007. (in Chinese)
[9] 刘攀, 郭生练, 雒征, 等. 求解水库优化调度问题的动态规划——遗传算法[J]. 武汉大学学报(工学版), 2007, 5: 1-6. LIU Pan, GUO Shenglian, LUO Zheng, et al. Optimization of reservoir operation by using dynamic programming-genetic algorithm. Engineering Journal of Wuhan University, 2007, 5: 1-6. (in Chinese)
[10] XUAN, Y., MEI, Y. and XU, J. Research of hydropower stations optimal operation based on the discrete differential dynamic programming—Progressive optimization algorithm combination method. Proceedings of the Seventh ACIS International Confer- ence on Software Engineering Research, Management and Ap- plications, SERA, Haikou, 2-4 December 2009.