[1]
|
刘振亚, 张启平 (2013) 国家电网发展模式研究. 中国电机工程学报, 07, 1-10.
|
[2]
|
Wang, C.X. and Li, J.S. (2003) Operation characteristics analysis of south China hybrid power network composed of HVAC and HVDC. Automation of Electric Power Systems, 16, 84-86.
|
[3]
|
刘振亚, 张启平, 董存, 等 (2014) 通过特高压直流实现大型能源基地风、光、火电力大规模高效率安全外送研究. 中国电机工程学报, 16, 2513-2522.
|
[4]
|
刘振亚, 秦晓辉, 赵良, 等. (2013) 特高压直流分层接入方式在多馈入直流电网的应用研究. 中国电机工程学报, 10, 1-7.
|
[5]
|
Buchholz, B.M. and Lei, X. (2000) Advanced solutions for power system analysis-computer study and real-time simulation. IEEE Transactions on Power Systems. IEEE Power System Technology, 2, 613-618.
|
[6]
|
Watson, N. and Arrillaga, J. (2003) Power systems electromagnetic transients simulation. Iet.
|
[7]
|
陶华 (2010) BPA向EMTDC/PSCAD模型转换方法的研究. 华北电力大学, 北京.
|
[8]
|
Anderson, G.W.J., Watson, N.R., Arnold, C.P., et al. (1995) A new hybrid algorithm for analysis of HVDC and FACTS systems. Proceedings of the International Conference on Energy Management and Power Delivery, 2, 462- 467.
|
[9]
|
Dommel, H.W. and Meyer, W.S. (1974) Computation of electromagnetic transients. Proceedings of the IEEE, 62, 983-993.
|
[10]
|
陶华, 许津津, 邹文聪 (2013) BPA向PSCAD模型转换的研究. 电力自动化设备, 8, 152-156.
|
[11]
|
余锐 (2001) 电力系统稳定性分析方法探究. 四川电力技术, 4, 3-6.
|
[12]
|
柳勇军, 闵勇, 梁旭 (2006) 电力系统数字混合仿真技术综述. 电网技术, 13, 38-43.
|
[13]
|
Wu, Z.X. and Zhou, X.X. (1998) Power System Analysis Software Package (PSASP)—An integrated power system analysis tool. Proceedings of the International Conference on Power System Technology, Beijing, 18-21 August 1998, 38-43.
|
[14]
|
Fankhauser, H.R., Aneros, K., Edris, A. and Torseng, S. (1990) Advanced simulation techniques for the analysis of power system dynamics. IEEE Computer Applications in Power, 3, 31-36.
|
[15]
|
Wang, X.G., Wilson, P. and Woodford, D. (2002) Interfacing transient stability program to EMTDC program. Proceedings of the International Conference on Power System Technology, Kunming, 13-17 October 2002, 272-274.
|
[16]
|
许烽, 翁华, 徐政, 陈新琪, 顾益磊, 裘鹏 (2013) 基于PSCAD/EMTDC的大规模交直流系统快速建模及有效性分析. 高电压技术, 11, 2762-2772.
|
[17]
|
糜作维, 周遥, 王林 (2010) 电力系统仿真工具综述. 电气开关, 4, 8-10.
|
[18]
|
Yue, C., Tian, F., Zhou, X., Wu, Z.-X. and Li, R.-M. (2006) Principle of interfaces for hybrid simulation of power system electromagnetic-electromechanical transient process. Power System Technology, 30, 23-27.
|
[19]
|
徐昊, 贺仁睦, 周静姝, 张民 (2011) 从BPA到EMTDC的动态模型转换. 现代电力, 3, 7-13.
|
[20]
|
Tessarolo, A., Castellan, S., Menis, R. and Ferrari, G. (2010) On the modeling of commutation transients in split-phase synchronous motors supplied by multiple load-commutated inverters. IEEE Transactions on Industrial Electronics, 57, 35-43.
|
[21]
|
Belyaev, D.V., Veinger, A.M., Lazarev, G.B., Novakovskii, A.N. and Sultanov, A.T. (2007) Semiconductor converters of electric energy electromagnetic and electromechanical processes in an electric drive under frequency converter parallel operation to induction motor. Russian Electrical Engineering, 78, 236-242.
|
[22]
|
Wang, T., Li, L., He, P. and Wang, X.-R. (2013) Comparison between electromechanical transient model and electromagnetic transient model of DC in low frequency oscillation analysis. Power System Protection and Control, 41, 17- 23.
|
[23]
|
徐政, 徐琼璟, 任雷 (2008) BPA与PSASP及PSS/E 机电暂态仿真的负荷模型比较. 南方电网技术, 5, 32-35.
|
[24]
|
Mahseredjian, J., Saad, O. and Dennetiere, S. (2009) Computation of power system transients: Modeling portability. Proceedings of the IEEE Power & Energy Society General Meeting, Calgary, 26-30 July 2009, 1-6.
|