大直径超深立井凿井井架的选型及结构优化研究
Large Diameter Deep Shaft Sinking Headframe Selection and Structure Optimization Research
DOI: 10.12677/ME.2015.33017, PDF, HTML, XML, 下载: 2,305  浏览: 7,131  国家科技经费支持
作者: 杜健民, 王 帅, 刘志强:中国矿业大学力学与建筑工程学院,江苏 徐州;马维清, 马 银:中国华冶科工集团有限公司,北京
关键词: 大直径超深立井凿井井架选型结构优化Large Diameter Extra Deep Shaft Sinking Headframe Selection Structure Optimization
摘要: 随着凿井技术和凿井施工速度的不断提高,提高出矸速度和使用先进的设备成为必然,但是现有的井架不能满足需求,需要对井架的设备进行合理的布置。本文主要以思山岭矿副井井架为例,依据其工程背景,充分考虑凿井井架提升和悬吊设备布置的特征,对凿井井架进行选型及结构形式的优化,使优化后的凿井井架不仅可以保证结构杆件的力学性能和设备布置的合理化;而且还能有效减小结构杆件的尺寸,从而减少结构的用钢量,实现节约成本的目标,达到可观的经济效益。
Abstract: With the increasing speed of sinking headframe technology and construction, to increase the speed of gangue and use advanced equipment become inevitable, but the existing derrick can’t meet the demand; it is necessary to arrange the equipment reasonably. This article mainly takes the Sishan ling sinking headframe as an example in which the characteristics of sinking headframe lifting and suspension equipment layout are took into account fully based on the engineering background, and then the selection and structure of sinking headframe are optimized. After optimization, the sinking headframe can not only ensure the rod reasonable mechanical properties and equipment layout structure, but also effectively reduce the size of the structure member, so that the amount of steel structure can be reduced, and thus the goal of cost saving and considerable economic benefits must be achieved.
文章引用:杜健民, 马维清, 王帅, 马银, 刘志强. 大直径超深立井凿井井架的选型及结构优化研究[J]. 矿山工程, 2015, 3(3): 118-127. http://dx.doi.org/10.12677/ME.2015.33017

参考文献

[1] 储明来, 姜建胜 (2000) SJY-18型试油井架优化设计. 钻采工艺, 6, 42-45.
[2] 周传喜, 张延水, 南丽华 (2008) 海洋修井机井架有限元分析及结构优化. 石油机械, 9, 54-57.
[3] 王惠德, 张爱林 (1987) 井架结构优化设计——空间刚架模型. 石油学报, 1, 91-101.
[4] 徐海宁 (2008) 超大直径深竖井施工技术优化研究.同济大学, 上海.
[5] 史天生 (1993) 深井凿井技术与装备. 世界煤炭技术, 8, 13-19.
[6] Wang, Z.H., Li, Q. and Zhao, C.H. (2011) Experimental study on ultimate bearing capacity of perfobond rib shear connectors. 2011 International Conference on Multimedia Technology (ICMT), Hangzhou, 26-28 July 2011, 1550- 1553.
http://dx.doi.org/10.1109/icmt.2011.6003176
[7] Yang, Y.-B., Yang, C.-T., Chang, T.-P. and Chang, P.-K. (1997) Effects of member buckling and yielding on ultimate strengths of space trusses. Engineering Structures, 19, 179-191.
http://dx.doi.org/10.1016/S0141-0296(96)00032-6
[8] 徐思凌 (2011) 净径5.5 m 立井凿井设备的配套与优化布置. 江西煤炭科技, 3, 35-37.
[9] 周艳龙, 张鹏, 易晓程 (2009) 基于改进蚁群算法的钢结构优化设计. 山西建筑, 16, 3-6.
[10] 陈佳杰 (2014) 大型凿井井架结构选型及其力学性能研究. 中国矿业大学, 徐州.