册亨水库溢洪道防渗帷幕灌浆经验总结
Experience of Impervious Curtain Grouting at Ceheng Reservoir Spillway
DOI: 10.12677/HJCE.2016.55025, PDF, HTML, XML, 下载: 1,445  浏览: 3,234 
作者: 朱志勇, 游志超, 李 伟*:中水珠江规划勘测设计有限公司,广东 广州
关键词: 水库防渗帷幕灌浆Reservoir Impervious Curtain Grouting
摘要: 本文以册亨水库溢洪道防渗帷幕灌浆为例,介绍薄弱坝体缺陷(渗漏)部位处理的技术方法,阐述成功防渗处理的灌浆设计方案及主要施工工艺,对类似坝体的基础防渗帷幕灌浆处理有很好的借鉴作用。
Abstract: Taken Ceheng reservoir spillway’s impervious curtain grouting as an example, this paper intro-duces weak dam defect (leakage) parts of the processing technology and methods, and expounds the successful anti-seepage grouting design scheme and main construction process. It provides a good reference to impervious curtain grouting treatment for similar dam foundation.
文章引用:朱志勇, 游志超, 李伟. 册亨水库溢洪道防渗帷幕灌浆经验总结[J]. 土木工程, 2016, 5(5): 190-195. http://dx.doi.org/10.12677/HJCE.2016.55025