[1]
|
温权, 张士军, 张勇传. 葛洲坝隔河岩联合调峰长期优化调度[J]. 华中理工大学学报, 1999, 27(2): 55-57.
WEN Quan, ZHANG Shijun and ZHANG Yong. Long term optimal dispatch of Gezhouba Dam river rock combined peak shaving. Journal of Huazhong University of Science and Technology, 1999, 27(2): 55-57. (in Chinese)
|
[2]
|
李承军, 马寅午. 水电站调峰效益期望模型初探[J]. 水电能源科学, 1997, 15(4): 17-21.
Li Chengjun, Ma Yinwu. Primary study on the mathematic model of peak load hydroelectric plant. Water Resources and Power, 1997, 15(4): 17-21. (in Chinese)
|
[3]
|
何莉, 伍永刚, 张勇传, 等. 梯级水电站短期调峰运行方式研究[J]. 水力发电, 2006, 32(5): 71-73.
HE Li, WU Yonggang, ZHANG Yong, et al. Research on the short-term peak load operation mode of cascade hydropower stations. Water Power, 2006, 32(5): 71-73. (in Chinese)
|
[4]
|
苏学灵, 纪昌明, 黄小锋, 等. 混合式抽水蓄能电站在梯级水电站群中的优化调度[J]. 电力系统自动化, 2010(4): 29-33.
SU Xueling, JI Changming, HUANG Xiaofeng, et al. Optimal dispatch of hybrid pumped storage power station in cascade hydropower stations. Automation of Electric Power Systems, 2010, 43(3): 29-33. (in Chinese)
|
[5]
|
李彬艳. 水电站长期调峰初步研究[D]: [硕士学位论文]. 武汉: 华中科技大学, 2007.
LI Binyan. Research on long term peak regulation of hydropower station. Wuhan: Huazhong University of Science and Technology, 2007. (in Chinese)
|
[6]
|
武新宇, 程春田, 李刚, 等. 水电站群长期典型日调峰电量最大模型研究[J]. 水利学报, 2012, 43(3): 363-371.
WU Xinyu, CHENG Chuntian, LI Gang, et al. Long term group typical daily maximum peaking capacity model of hydropower station. Journal of Hydraulic Engineering, 2012, 43(3): 363-371. (in Chinese)
|
[7]
|
程春田, 申建建, 武新宇, 廖胜利. 大规模复杂水电优化调度系统的实用化求解策略及方法[J]. 水利学报, 2012, 43(7): 785-795, 802.
CHENG Chuntian, SHEN Jianjian, WU Xinyu, et al. Practical solution strategies and methods of large-scale complex hydropower system operations. Journal of Hydraulic Engineering, 2012, 43(7): 785-795, 802. (in Chinese)
|
[8]
|
廖胜利, 程春田, 蔡华祥, 等. 改进的火电调峰方式[J]. 电力系统自动化, 2006, 30(1): 89-93.
LIAO Shengli, CHENG Chuntian, CAI Huaxiang, et al. Thermal power peaking improved method. Automation of Electric Power Systems, 2006, 30(1): 89-93. (in Chinese)
|