中巴公路艾尔库然沟冰川泥石流发育特征与防治对策
The Development Condition and Prevention Countermeasure of Glacier Debris Flow in the Aierkuran Gully along the Sino-Pakistan Highway
DOI: 10.12677/JWRR.2017.62014, PDF, HTML, XML,  被引量 下载: 1,975  浏览: 9,361  国家自然科学基金支持
作者: 魏学利, 李 宾, 赵怀义:新疆维吾尔自治区交通规划勘察设计研究院,新疆 乌鲁木齐;李 伟:新疆维吾尔自治区交通规划勘察设计研究院,新疆 乌鲁木齐;新疆大学,新疆 乌鲁木齐
关键词: 中巴公路泥石流艾尔库然沟发育条件防治对策Sino-Pakistan Highway Debris Flow Aierkuran Gully Development Condition Prevention Measures
摘要: 以中巴公路K1601处艾尔库然沟为研究对象,分析艾尔库然沟冰川泥石流的形成条件和起动模式,初步提出合理的防治模式和治理对策。研究发现:艾尔库然沟物源为集中供给型,主要分布在出山口老堆积扇,总方量约为12.7 × 105 m3,其中动储量为36.8 × 104 m3,夏季大量冰川融水沿陡峭岩质山坡(>40˚)倾泻而下,高位势能瞬间转化为强大水流动能,沿大比降沟道(363-176‰)冲刷堆积扇松散物质,在较短时间形成规模较大泥石流,其起动模式可归纳为冲刷起动型和淤塞溃决型两种。结合泥石流形成条件、沟道地形地貌及泥石流危害形式等,提出顺直排泄+梯级降能+主河输移的防治模式,主要工程措施包括铅丝笼浅槛群和堆石导流堤等。研究结果可为中巴公路沿线冰川泥石流的防治提供参考依据。
Abstract: The Aierkuran gully locating on the Sino-Pakistan Highway K1601 was selected as the case study. The formation conditions and startup mode of the glacial debris flow were analyzed, and a reasonable and effective prevention measure was proposed preliminarily. The results show that the material sources of debris flow in the Aierkuran gully belonged to the central supplying type, and are mainly distributed in the old accumulation fan out of the mountain. The total volume of material sources is about 12.7 × 105 m3, and the dynamic storage is about 36.8 × 104 m3. The large numbers of glacier melt water poured down along the steep rock slope (>40˚) in summer. The high potential energy is transformed into strong flow kinetic energy immediately, which flushes the loose materials of the alluvial fan along the steep slope (363-176‰) gully, and further a large-scale debris flow would be triggered. The startup mode can be summed up as scour-start type and blockage-outburst type. Combining with the formation conditions, the gully topography and the destruction form, etc., the control mode of “direct and straight draining + cascade energy lowering + main river transporting” is suggested and the main control measures included the ground sills and the enrockment diversion dike. The results will provide the reference base for preventing the glacial debris flow along the Sino-Pakistan Highway.
文章引用:魏学利, 李宾, 赵怀义, 李伟. 中巴公路艾尔库然沟冰川泥石流发育特征与防治对策[J]. 水资源研究, 2017, 6(2): 103-111. https://doi.org/10.12677/JWRR.2017.62014

参考文献

[1] 屈永平, 朱静, 卜祥航, 等. 西藏林芝地区冰川降雨型泥石流起动实验初步研究[J]. 岩石力学与工程学报, 2015, 34(1): 3256-3266. QU Yongping, ZHU Jing, BU Xianghang, et al. Preliminary starting experiment study glacial rainfall debris flow, in Nyingchi, Tibet. Chinese Journal of Rock Mechanics and Engineering, 2015, 34(1): 3256-3266. (in Chinese)
[2] 张学进. 中巴公路沿线地质灾害分布特征及防治[J]. 重庆工商大学学报(自然科学版), 2013(2): 45-50. ZHANG Xuejin. Study on the distribution characteristics and control for geological disasters along International Karakoram Highway. Journal of Chongqing Technol Business University (Natural Science Edition), 2013(2): 45-50. (in Chinese)
[3] 陆军, 刘杰, 王立波. 中巴喀喇昆仑公路奥依塔格–布伦口段泥石流灾害及防治[J]. 防灾科技学院学报, 2015(2): 42-49. LU Jun, LIU Jie and WANG Libo. Debris flow hazards and prevention along the Aoyitage-Bulunkou section of the International Karakoram Highway. Journal of Institute of Disaster Prevention, 2015(2): 42-49. (in Chinese)
[4] 施雅风, 张祥松. 喀喇昆仑山巴托拉冰川的近代进退历史变化[J]. 地理学报, 1978, 33(1): 27-42. SHI Yafeng, ZHANG Hexiang. Historical variations in the advance and retreat of the barura glacier in the Karakoram mountains. Acta Geographica Sinica, 1978, 33(1): 27-42. (in Chinese)
[5] 张祥松. 喀喇昆仑公路沿线冰川的近期进退变化[J]. 地理学报, 1980, 35(2): 149-160. Zhang Xiangsong. Recent variations in the glacial termini along the Karakoram highway. Acta Geographica Sinica, 1980, 35(2): 149-160. (in Chinese)
[6] 刘杰, 毛爱民, 王立波, 等. 中巴喀喇昆仑公路奥依塔克镇–布伦口段泥石流灾害及防治[J]. 公路, 2015(12): 8-14. LIU Jie, MAO Aimin, WANG Libo, et al. Debris flow disaster and prevention on the Aoyitage-Bulunkou section of Karakoram highway from China to Pakistan. Highway, 2015(12): 8-14. (in Chinese)
[7] 魏小佳, 裴向军, 蒙明辉. 中巴公路奥依塔克–布伦口段高寒山区泥石流特征[J]. 水土保持通报, 2015(3): 354-358. WEI Xiaojia, PEI Xiangjun and MENG Minghui. Characteristics of debris flow at Aoyitake-Bulunkou section of Sino-Pakistan Highway in Alpine Mountains. Bulletion of Soil and Water Conservation, 2015(3): 354-358. (in Chinese)
[8] 朱颖彦, 杨志全, 廖丽萍, 等. 中巴喀喇昆仑公路冰川地貌地质灾害[J]. 灾害学, 2014, 29(3): 81-90. ZHU Yingyan, YANG Zhiquan, LIAO Liping, et al. Glacialized geomorphological geohazard along China-Pakistan interna-tional Karakoram Highway. Journal of Catastrophology, 2014, 29(3): 81-90. (in Chinese)
[9] 廖丽萍, 朱颖彦, 杨志全, 等. 中巴公路泥石流灾害破坏及防治优化[J]. 地质科技情报, 2013, 32(6): 168-174. LIAO Liping, ZHU Yingyan, YANG Zhiquan, et al. Debris flow hazards and prevention optimization along international Karakoram highway. Geological Science and Technology Information, 2013, 32(6): 168-174. (in Chinese)
[10] 胡进, 朱颖彦, 杨志全, 廖丽萍. 中巴公路沿线冰川泥石流的形成与危险性评估[J]. 地质科技情报, 2013(6): 181-185. HU Jin, ZHU Yingyan, YANG Zhiquan and LIAO Liping. Formation and hazard evaluation of glacial debris flow disasters along International Karakoram Highway. Geological Science and Technology Information, 2013(6): 181-185. (in Chinese)
[11] 王景荣. 中巴公路喀什至塔什库尔干路段冰川泥石流[J]. 冰川冻土, 1987, 9(1): 87-95. WANG Jingrong. An analysis of the harm and genesis of glacial debris flow along the China-Pakistan highway from Kashi to Tashikuergan. Journal of Glaciology and Geocryology, 1987, 9(1): 87-95. (in Chinese)
[12] 铁永波, 李宗亮. 冰川泥石流形成机理研究进展[J]. 水科学进展, 2010, 21(6): 861-866. TIE Yongbo, LI Zongliang. Progress in the study of glacial debris flow mechanisms. Advance in Water Science, 2010, 21(6): 861-866. (in Chinese)