印度Jhajjar 660 MW超临界机组3号高压加热器泄露原因分析及对策Reasons and Counterplans of Leakage of the Third High Pressure Heater in India Jhajjar 660 MW Supercritical Power Plant
张开利
清洁煤与能源Vol.2 No.2, 全文下载: PDF HTML DOI:10.12677/CCE.2014.22003, June 23 2014
350 MW超临界单列风机供热机组能耗分析Consumption Analysis of 350 MW Supercritical Single Row Fan Heat Supply Unit Energy
赵海钟, 张继文, 党小建, 付龙龙
电力与能源进展Vol.3 No.6, 全文下载: PDF HTML XML DOI:10.12677/AEPE.2015.36028, December 25 2015
超超临界机组锅炉受热面氧化皮堆积原因分析与防范措施Cause Analysis and Preventive Measures of Oxide Scale Accumulation on Heating Surface of Ultra Supercritical Unit Boiler
杜继臻, 张华德, 高 杰, 周 权, 庞凯杰, 刘立鹏
应用物理Vol.12 No.8, 全文下载: PDF HTML XML DOI:10.12677/APP.2022.128055, August 25 2022
纯十八胺用于1000 MW超超临界机组停用保护的必要性和可行性分析及实践The Necessity and Feasibility Analysis and Practice of the Pure Octadecylamine Used for Shutting down Protection of the 1000 MW Ultra Supercritical Thermal Power Generating Units
崔学军, 张 瑜, 谢学军
化学工程与技术Vol.8 No.4, 全文下载: PDF HTML XML DOI:10.12677/HJCET.2018.84031, July 19 2018
Jhajjar电厂660 MW机组燃烧试验研究The Combustion Adjustment Research on 660 MW Unit of Jhajjar Power Plant
清洁煤与能源Vol.2 No.2, 全文下载: PDF HTML DOI:10.12677/CCE.2014.22004, June 23 2014
河南某2 × 660 MW燃煤机组废水零排放方案研究Scheme of Zero Wastewater Discharge System for a 2 × 660 MW Power Plant in Henan Province
胡 耘, 张 明, 孙雪丽
环境保护前沿Vol.5 No.6, 全文下载: PDF HTML XML DOI:10.12677/AEP.2015.56022, December 23 2015