Short-term load forecasting for electric power systems using the PSO-SVR and FCM clustering techniques

作者:
D PanK XieT GuoX Huang

关键词:
load forecasting short-time load PSO

摘要:
This paper presents a new combined method for the short-term load forecasting of electric power systems based on the Fuzzy c-means (FCM) clustering, particle swarm optimization (PSO) and support vector regression (SVR) techniques. The training samples used in this method are of the same data type as the learning samples in the forecasting process and selected by a fuzzy clustering technique according to the degree of similarity of the input samples considering the periodic characteristics of the load. PSO is applied to optimize the model parameters. The complicated nonlinear relationships between the factors influencing the load and the load forecasting can be regressed using the SVR. The practical load data from a city in Chongqing was used to illustrate the proposed method, and the results indicate that the proposed method can obtain higher accuracy compared with the traditional method, and is effective for forecasting the short-term load of power systems.

在线下载

相关文章:
在线客服:
对外合作:
联系方式:400-6379-560
投诉建议:feedback@hanspub.org
客服号

人工客服,优惠资讯,稿件咨询
公众号

科技前沿与学术知识分享