文章引用说明 更多>> (返回到该文章)

郭生练. 水库调度综合自动化系统[M]. 武汉: 武汉水利电力大学出版社, 2000. GUO Shenglian. Integrated automatic system for reservoir operation. Wuhan: Wuhan University of Hydraulic and Electrical Engineering Press, 2000. (in Chinese)

被以下文章引用:

  • 标题: 梯级水电站群日优化调度模型及应用Optimal Daily Operation of Cascade Hydropower Stations

    作者: 李立平, 郭生练, 周研来, 杨光

    关键字: 水库, 梯级水电站, 动态规划, 日优化调度Reservoir, Cascade Hydropower Station, Dynamic Programming, Daily Optimal Operation

    期刊名称: 《Journal of Water Resources Research》, Vol.3 No.4, 2014-08-13

    摘要: 采用以水定电和以电定水两种运行方式,分别以发电量最大和总耗水量最小为目标函数,建立了梯级水电站群日优化调度模型,并采用动态规划方法进行求解。使用梯级水电站群日发电资料和径流资料(2013年7月~12月)的应用检验结果表明,优化调度较实际调度提高发电量约0.67亿kW·h(增加11.54%)和减少耗水量0.26亿m3(减少−0.89%),发电保证率由92%提高到100%,显著提高了水电站群的发电效益。Daily operation models for cascade hydropower stations were proposed and developed in this paper. The dynamic programming (DP) was used to solve daily optimal operation for two deterministic models with the goal of maximizing the hydropower generation and minimizing turbine discharge of the cascade hydropower stations, respectively. The inflow (from July to December in 2013) and corresponding real-time hydropower record data were used. The optimal result showed that hydropower generation can be increased from 0.581 billion kW•h to 0.648 billion kW•h (or an increase 11.54%) and turbine discharge of the cascade hydropower stations can be decreased from 2.92 billion m3 to 2.89 billion m3 (or a decrease of 0.89%) compared with current operation method. The assurance rate of firm output can be increased from 92% to 100%.

在线客服:
对外合作:
联系方式:400-6379-560
投诉建议:feedback@hanspub.org
客服号

人工客服,优惠资讯,稿件咨询
公众号

科技前沿与学术知识分享