长江上游水库群提前蓄水联合优化调度研究
Optimal Joint Early Refill Operation of Multi-Reservoir System in Upper Yangtze River
DOI: 10.12677/JWRR.2017.65049, PDF, HTML, XML, 下载: 1,640  浏览: 3,534  国家科技经费支持
作者: 郭生练, 陈柯兵, 刘 攀, 何绍坤, 张剑亭:武汉大学,水资源安全保障湖北省协同创新中心,水资源与水电工程科学国家重点实验室,湖北 武汉
关键词: 水库群提前蓄水联合调度防洪安全长江上游Reservoir System Early Refill Joint Operation Flood Control Safety Upper Yangtze River
摘要: 综述水库群汛末提前蓄水调度的研究进展和存在的问题。通过解析复杂串并联水库群的空间分区解耦原理,研究分区控制的动态蓄水理论和方法。以变化环境下的水库群最优蓄水时机选择为切入点,建立水库群多目标联合蓄水调度模型并求解。制定基于分区控制的长江上游控制性水库蓄水方案及评价指标体系。溪洛渡、向家坝和三峡梯级水库的模拟调度结果表明,在确保防洪安全和满足其他约束条件的前提下,提前蓄水的年均发电量可增加30.44亿kW•h (增幅4.89%),并显著地提高了水库群的汛末蓄满率及水资源利用率。
Abstract: The advanced researches and related problems of early refill operation for multi-reservoir system were reviewed. The theory and method of dynamic refill operation was studied through analyzing the spatial aggregation and decomposition of complex cascade and parallel reservoirs. After selected the best multi-reservoirs refill chances under the change environment, a multi-objective joint refill operation model was proposed and then solved by optimization algorithms. The joint refill operation schemes of multi-reservoirs as well as the assessment index in the upper Yangtze River were suggested. The simulated refill operation results of the Xiluodu-Xiangjiaba-Three Gorges reservoirs show that the hydropower generation can increase 3.044 billion kW•h (or 4.89%) annually during refill period under the conditions of satisfying flood control safety and other constrains, and the refill storage rate and water resources utilization rate are also significantly increased.
文章引用:郭生练, 陈柯兵, 刘攀, 何绍坤, 张剑亭. 长江上游水库群提前蓄水联合优化调度研究[J]. 水资源研究, 2017, 6(5): 415-425. https://doi.org/10.12677/JWRR.2017.65049

参考文献

[1] 刘攀, 郭生练, 王才君, 周芬. 三峡水库动态汛限水位与蓄水时机选定的优化设计[J]. 水利学报, 2004, 35(7): 86-91. LIU Pan, GUO Shenglian, WANG Caijun and ZHOU Fen. Optimization of limited water level in flood season and impounding scheme for reservoir in Three Gorges Project. Journal of Hydraulic Engineering, 2004, 35(7): 86-91. (in Chinese)
[2] 李义天, 甘富万, 邓金运. 三峡水库9月分旬控制蓄水初步研究[J]. 水力发电学报, 2006, 24(1): 61-66. LI Yitian, GAN Fuwan and DENG Jinyun. Preliminary study on impounding water of Three Gorges Project in September. Journal of Hydroelectric Engineering, 2006, 25(1): 61-66. (in Chinese)
[3] 彭杨, 李义天, 张红武. 三峡水库汛末蓄水时间与目标决策研究[J]. 水科学进展, 2003, 14(6): 682-689. PENG Yang, LI Yitian, XIE Baoling, et al. Study on an ahead of schedule impounding scheme of the Three Gorges Project (TGP) in the flood recession period. Advances in Water Science, 2003, 14(6): 682-689. (in Chinese)
[4] 刘心愿, 郭生练, 刘攀, 李响. 考虑综合利用要求的三峡水库提前蓄水方案研究[J]. 水科学进展, 2009, 20(6): 851-856. LIU Xinyuan, GUO Shenglian, LIU Pan and LI Xiang. Scheme of impounding in advance for the Three Gorges Reservoir by considering the comprehensive utilization benefits. Advances in Water Science, 2009, 20(6): 851-856. (in Chinese)
[5] 郭家力, 郭生练, 李天元, 陈桂亚. 三峡水库提前蓄水防洪风险分析模型及其应用[J]. 水力发电学报, 2012, 30(4): 16-21. GUO Jiali, GUO Shenglian, LI Tianyuan and CHEN Guiya. Flood control risk analysis model for Three Gorges Reservoir early refill operation. Journal of Hydroelectric Engineering, 2012, 30(4): 16-21. (in Chinese)
[6] 李雨, 郭生练, 郭海晋, 张洪刚,丁胜祥. 三峡水库提前蓄水的防洪风险与效益分析[J]. 长江科学院院报, 2013, 30(1): 8-14. LI Yu, GUO Shenglian, GUO Haijin, ZHANG Honggan and DIN Shengxiang. Flood control risk and benefit of impounding water in advance for the Three Gorges Reservoir. Journal of Yangtze River Scientific Research Institute, 2013, 30(1): 8-14. (in Chinese)
[7] 王俊, 郭生练, 丁胜祥. 三峡水库提前蓄水关键技术研究[M]. 武汉: 长江出版社, 2012. WANG Jun, GUO Shenglian and DIN Shengxiang. Key technologies for early refill operation of Three Gorges Reservoir. Wuhan: Changjiang River Press, 2012.
[8] 付湘, 李安强, 石萍. 不影响三峡水库蓄水的上游水库群蓄水方法研究[J]. 人民长江, 2013, 44(4): 8-12. FU Xiang, LI Anqiang and SHI Ping. Analysis on water storage plan of upstream reservoir group on the premise of ensuring impoundment of Three Gorges Reservoir, Yangtze River, 2013, 44(4): 8-12. (in Chinese)
[9] 欧阳硕, 周建中, 周超, 等. 金沙江下游梯级与三峡梯级枢纽联合蓄放水调度研究[J]. 水利学报, 2013, 44(4): 435-443. OUYANG Shuo, ZHOU Jianzhong, ZHOU Chao, et al. Research on impounding dispatch for the lower cascade reservoir in Jinsha River and Three Gorges cascade. Journal of Hydraulic Engineering, 2013, 44(4): 435-443. (in Chinese)
[10] 丁毅, 傅巧萍. 长江上游梯级水库群蓄水方式初步研究[J]. 人民长江, 2013, 44(10): 72-75. DING Yi, FU Qiaoping. Preliminary research on water storage mode of cascade reservoirs in upper Yangtze River. Yangtze River, 2013, 44(10): 72-75. (in Chinese)
[11] 黄草, 王忠静, 李书飞, 等. 长江上游水库群多目标优化调度模型及应用研究(I)模型原理及求解[J]. 水利学报, 2014, 45(9): 1009-1018. HUANG Cao, WANG Zhongjing, LI Shufei, et al. A multi-reservoir in the upper Yangtze operation optimization model and application River Basin (I) principle and solution of the model. Journal of Hydraulic Engineering, 2014, 45(9): 1009-1018. (in Chinese)
[12] 黄草, 王忠静, 鲁军, 等. 长江上游水库群多目标优化调度模型及应用研究(II)水库群调度规则及蓄放次序[J]. 水利学报, 2014, 45(10): 1175-1183. HUANG Cao, WANG Zhongjing, LU Jun, et al. A multi-reservoir operation optimization model and application in the upper Yangtze River Basin (II) operation rules and water releasing/storing sequences. Journal of Hydraulic Engineering, 2014, 45(10): 1175-1183. (in Chinese)
[13] 周研来, 郭生练, 陈进. 溪洛渡–向家坝–三峡梯级水库联合蓄水方案与多目标决策研究[J]. 水利学报, 2015, 46(10): 1135-1144. ZHOU Yanlai, GUO Shenglian and CHEN Jin. Multi-objective decision and joint refill schemes of Xiluodu-Xiangjiaba-Three Gorges cascade reservoirs. Journal of Hydraulic Engineering, 2015, 46(10): 1135-1144. (in Chinese)
[14] 刘强, 钟平安, 徐斌, 郭乐, 陈宇婷. 三峡及金沙江下游梯级水库群蓄水期联合调度策略[J]. 南水北调与水利科技, 2016, 14(5): 62-70. LIU Qiang, Zhong Pingan, XU Bin, GUO Le and CHEN Yuting. Joint operation strategy of water impoundment period of Three Gorges Jinsha River lower reach cascade reservoirs. South to North Water Transfers and Water Science & Technology, 2016, 14(5): 62-70. (in Chinese)
[15] CHEN, J. H., GUO, S. L., LI, Y., LIU, P. and ZHOU, Y. L. Joint operation and dynamic control of flood limited water levels for cascade reservoirs. Water Resources Management, 2013, 27(3): 749-763.
[16] 郭生练, 陈炯宏, 刘攀, 李雨. 水库群联合优化调度研究进展与展望[J]. 水科学进展, 2010, 21(4): 496-503. GUO Shenglian, CHEN Jionghong, LIU Pan, LI Yu. State-of-the-art review of joint operation for multi-reservoir systems. Advances in Water Science, 2010, 21(4): 496-503. (in Chinese)
[17] 杨光, 郭生练, 刘攀, 李立平, 刘章君. PA-DDS算法在水库多目标优化调度中的应用[J]. 水利学报, 2016, 47(6): 789-797. YANG Guang, GUO Shenglian, LIU Pan, LI Liping and LIU Zhangjun. PA-DDS algorithm for multi-objective reservoir operation. Journal of Hydraulic Engineering, 2016, 47(6): 789-797. (in Chinese)