综合测试方法在黄登水电站工程大坝灌浆效果检测中应用
Application of Comprehensive Test Method in Grouting Effect at Huangdeng Hydropower Station Dam Project
摘要:
坝基岩体灌浆效果的好坏直接影响到岩体的整体质量,在灌浆前和灌浆后采用多种综合的测试手段和方法对岩体进行检测,可提供灌前岩层裂隙的发育情况,为指导施工及变更设计方案提供科学依据,在灌后可根据综合检测成果来客观评价灌浆效果,为施工质量提供有利保障。
Abstract:
The effect of grouting for the dam foundation rock could influence the overall quality of the rock. The inspection of the rock before and after grouting by comprehensive measurement techniques shows the crack development in the rock before grouting. It could provide the guidance for con-struction and the design proposal modification. It also could judge the effect of grouting based on the comprehensive measurement at the after-grouting stage.
参考文献
|
[1]
|
马国凯, 许德运, 等. 云南澜沧江黄登水电站枢纽工程蓄水安全鉴定自检报告[R]. 昆明: 中国电建集团昆明勘测设计研究院有限公司, 2017.
|
|
[2]
|
李森林, 毛卓良, 等. 云南澜沧江黄登水电站第二阶段蓄水验收帷幕灌浆第三方检测报告[R]. 杭州: 中国电建集团华东勘测设计研究院有限公司, 2018.
|
|
[3]
|
水电水利工程钻探规程[S]. DL/T 5013-2005.
|
|
[4]
|
水电水利工程物探规程[S]. DL/T 5010-2005.
|
|
[5]
|
水电水利工程岩石试验规程[S]. DL/T 5368-2007.
|
|
[6]
|
水电水利工程钻孔压水试验规程[S]. DL/T 5331-2005.
|