沙特阿美项目HSE管理风险与应对
The HSE Risks and Control of Saudi Aramco Project
摘要: 初次进入沙特市场,由于对阿美HSE管理体系的不够熟悉,对阿美HSE管理程序的不够了解,对阿美HSE管理执行力度的不够适应,遇到了许多的挑战,本文将遇到的问题和困难总结为沙特阿美项目HSE管理风险,对这些项目HSE管理风险进行了较为详细的阐述和总结,并有针对性地总结了应对措施。
Abstract:
When entering the Saudi market for the first time, many challenges have been encountered due to the lack of familiarity with Aramco’s HSE management system, the lack of understanding of Aramco’s HSE management procedures and the lack of adaptation to Aramco’s HSE management execution. This paper summarized the problems and difficulties encountered as Saudi Aramco project HSE management risks. The HSE management risks of these projects are elaborated and summarized in detail, and the corresponding measures are summarized.
参考文献
|
[1]
|
未来智库. 全球顶级石油公司沙特阿美深度解析[Z/OL]. https://www.vzkoo.com/news/3857.html, 2020-06-04.
|
|
[2]
|
孙壮, 刘弢. 沙特阿美石油公司EPC项目合同简析[J]. 项目管理技术, 2018, 16(2): 110-113.
|
|
[3]
|
樊琳. 沙特阿美石油公司HSE管理典型做法及启示[J]. 安全、健康和环境, 2019(1): 58-60.
|
|
[4]
|
张光豪. 境外安全风险识别与安保体系建设[J]. 国际工程与劳务, 2018(6): 73-74.
|
|
[5]
|
谢恒. 沙特阿美EPCT总承包项目合同[J]. 项目管理技术, 2010, 8(9): 79-82.
|