文章引用说明 更多>> (返回到该文章)

王红霞, 何祖发, 侍刚 (2008) 阿深黄河特大桥静动载试验. 世界桥梁, 4, 46-49.

被以下文章引用:

  • 标题: 常熟碧溪大桥静力荷载试验A Static Load Test of Bixi Bridge in Changshu

    作者: 仲时进, 于杰, 孙文

    关键字: 碧溪大桥, 静载试验, 应力, 位移, 校验系数Bixi Bridge, Static Load Test, Stress, Displacement, Calibration Coefficient

    期刊名称: 《Hans Journal of Civil Engineering》, Vol.3 No.5, 2014-09-19

    摘要: 为了检验常熟碧溪大桥施工质量是否符合设计要求,保证桥梁使用的安全性,根据设计荷载和有关规范进行了结构分析,制定了静载试验方案,并对试验数据进行了分析。试验结果显示:大桥实际承载力及变形状态与理论计算基本吻合,结构的强度和刚度满足设计要求,卸载后回零良好,结构工作时处于弹性状态,桥梁工作性能满足设计和安全运营要求。In order to test whether the construction quality of Bixi Bridge in Changshu meets the design re-quirements, and to ensure the safety of the bridge, the structure was analyzed and a static load test program was developed according to the design loads and the relevant specifications. Then the test data were analyzed. Test results showed that: the actual capacity and deformation of the bridge are consistent with the theoretical results. The strength and stiffness of the structure meet the design requirements. The stress moves back to zero well after unloading and the structure works are in an elastic state. The performance of the bridge meets the requirements of design and security operations.

在线客服:
对外合作:
联系方式:400-6379-560
投诉建议:feedback@hanspub.org
客服号

人工客服,优惠资讯,稿件咨询
公众号

科技前沿与学术知识分享