周转空间受限的装配式建筑准时(JIT)调度优化Optimization of Just-in-Time (JIT) Scheduling for Prefabricated Buildings with Limited Turnover Space
陈静颖 下载量: 334 浏览量: 1,364
运筹与模糊学 Vol.12 No.1, February 28 2022, PDF, HTML, XML DOI:10.12677/ORF.2022.121013 被引量
STEM视角下研究生数学折纸科普团队的实践探索Practical Exploration of Postgraduate Mathematics Origami Science Popularization Team from the Perspective of STEM
陈静颖, 陆新生 下载量: 309 浏览量: 568
创新教育研究 Vol.10 No.3, March 21 2022, PDF, HTML, XML DOI:10.12677/CES.2022.103074 被引量