基于CAPM结合OJ模型的风电行业基准收益率研究
Study on Benchmark Yield in Wind Power Industry Based on the CAPM and OJ Model
摘要: 风电在我国具有很大的发展潜力,然而进行风电投资时基准收益率的确定是摆在投资者面前的一大难题。基准收益率是项目财务内部收益率指标的基准和判据,也是企业判断项目是否可行的重要依据,采用加权平均资金成本法(WACC)和资本资产定价模型(CAPM)相结合的方法来确定投资项目基准收益率是目前最普遍的方法。本文拟采用CAPM和OJ模型来测算风电投资项目的股权资本成本,再用加权平均资金成本测算其基准收益率,为以后进行风电投资提供有力的投资决策依据。
Abstract: Wind power is of great potential in China; however, determining the benchmark yield of wind power investment is a major problem placed in front of investors. The benchmark yield is the benchmarks and indicators of the project’s financial internal return rate and can also judge the feasibility of the project. It is common to use the method combining the Weighted Average Cost of Capital method (WACC) and Capital Asset Pricing Model (CAPM) to calculate the benchmark yield of investment project. This paper attempts to combine CAPM with OJ models to measure the cost of equity capital in wind power investment, and then estimates its benchmark yield through weighted average cost of capital, providing basis for investment decision in wind power investment.
文章引用:张福伟, 王文晶. 基于CAPM结合OJ模型的风电行业基准收益率研究[J]. 电力与能源进展, 2016, 4(4): 146-153. http://dx.doi.org/10.12677/AEPE.2016.44019

参考文献

[1] Laekner, M.A., Rogers, A.L. and Manwell, J.E. (2008) Uncertainty Analysis in MCP-Based Wind Resource Assessment and Energy Production Estimation. Journal of Solar Energy Engineering, 13, 61-73.
http://dx.doi.org/10.1115/1.2931499
[2] 刘佳明, 张小丽. 风电经济性的简易评估[J]. 技术经济与管理研究, 2007(2): 52-53.
[3] 相娟. 风电场运行经济性综合评价方法[J]. 时代经贸(下旬刊), 2010, 5(2): 16-17+19.
[4] 李靖, 王晓东. 中国海上风电开发经济性初步估计[J]. 中国三峡建设, 2007(1): 53-55.
[5] Sharpe, W.F., et al. (1964) Capital Assets Pricing: Market Equilibrium Theory under the Condition of Risk. The Journal of Finance, 19, 224-232.
[6] 马东霞, 杨殿. 企业投资项目财务基准收益率的确定方法探讨[J]. 技术经济与管理研究, 2005(2): 96-97.
[7] 雷泽丽, 黄文杰, 江伟. 电网建设项目融资租赁基准收益率的确定[J]. 价值工程, 2012, 28(1): 145-147.
[8] 兰峰. 基于WACC结合Fama-French三因素模型的再生水行业基准收益率研究[D]: [博士学位论文]. 西安: 西安建筑科技大学, 2010.
[9] 李凯. 基于蒙特卡洛法确定建设项目财务基准收益率[J]. 科技创新导报, 2012(9): 199.
[10] Abbes, M. and Belhadj, J. (2012) Wind Resource Estimation and Wind Park Design in El-Kef Region, Tunisia. Energy, 40, 348-357.
http://dx.doi.org/10.1016/j.energy.2012.01.061
[11] 张明锋, 邓凯, 陈波, 王盛, 高涛, 方正, 王树春. 中国风电产业现状与发展[J]. 机电工程, 2010, 27(1): 1-3+14 .
[12] Laekner, M.A., Rogers, A.L. and Manwell, J.E. (2008) Uncertainty Analysis in MCP-Based Wind Resource Assessment and Energy Production Estimation. Journal of Solar Energy Engineering, 13, 61-73.
http://dx.doi.org/10.1115/1.2931499
[13] 白文斌. 世界风电发展现状及前景展望[J]. 科技情报开发与经济, 2012, 22(22): 129-132.
[14] Albadi, M.H. and El-Saadany, E.F. (2009) The Role of Taxation Policy and Incentives in Wind-Based Distributed Generation Projects Viability: Ontario Case Study. Renewable Energy, 34, 2224-2233.
http://dx.doi.org/10.1016/j.renene.2009.03.017
[15] 杨静. 新能源投资项目基准收益率确定方法研究[D]: [硕士学位论文]. 北京: 华北电力大学, 2013.
[16] 王建斌, 王少剑. 基于CAPM模型的水煤浆行业基准收益率研究[J]. 会计之友, 2014(6): 71-75.
[17] 任翠玉. 中国上市公司股权资本成本影响因素研究[D]: [博士学位论文]. 大连: 东北财经大学, 2014.