±800 kV直流输电系统主回路参数研究
Study on Main Circuit Parameters for ±800 kV DC Transmission Project
摘要:
换流站主回路设备参数选择对直流输电系统的设计十分重要。本文以哈密–郑州±800 kV直流输电工程为例,对换流变压器短路阻抗、换流变压器分接开关级数、换流阀空载直流电压、平波电抗器电感值等关键参数进行了选择,并通过多种运行方式下的主回路稳态特性计算来校核主回路设备参数是否合理。
Abstract: The main circuit parameters of converter station equipments are very important for Ultra-High Voltage Direct Current (UHVDC) transmission system design. Taking ±800 kV DC project from Hami to Zhengzhou for example, the key parameters such as short-circuit impedance, OLTC steps of converter transformer, no-load direct-current voltage of converter valve, smoothing reactor inductance are selected. Finally, the parameters selected are checked out through calculations of main circuit steady-state in different operation modes.
参考文献
[1]
|
刘振亚. 特高压直流输电技术研究成果专辑(2005年)[M]. 北京: 中国电力出版社, 2006.
|
[2]
|
袁清云. 特高压直流输电技术现状及在我国的应用前景[J]. 电网技术, 2005, 29(14): 1-3.
|
[3]
|
刘宝宏, 殷威扬, 杨志栋等. ±800 kV特高压直流输电系统主回路参数研究[J]. 高电压技术, 2007, 33(1): 17-21.
|
[4]
|
黄莹, 黎小林, 饶宏. 云广±800kV直流输电工程主回路设备参数选择[J]. 南方电网技术, 2010, 4(4): 56-59.
|
[5]
|
赵畹君. 高压直流输电工程技术[M]. 北京: 中国电力出版社, 2004.
|
[6]
|
DL/T 5223-2005, 高压直流换流站设计技术规定[S].
|
[7]
|
王峰, 徐政, 黄莹等. 高压直流输电主回路稳态参数计算[J]. 电工技术学报, 2009, 24(5): 135-140.
|