安康水库汛期运行水位实时动态控制方案
Real-Time and Dynamic Control of Water Level Operating Scheme during Flood Season for the Ankang Reservoir
DOI: 10.12677/JWRR.2013.24035, PDF, HTML, 下载: 3,195  浏览: 7,517  科研立项经费支持
作者: 杨 光*, 郭生练, 周研来:武汉大学水资源与水电工程科学国家重点实验室
关键词: 汛期运行水位实时动态控制多目标决策安康水库Operating Water Level; Real-Time and Dynamic Control; Multi-Objective Decision; Ankang Reservoir
摘要: 汛期运行水位实时动态控制是协调水库防洪与兴利矛盾的一条有效措施。本文采用风险分析法推求了安康水库汛期运行水位动态控制域,建立了考虑洪水预报信息的汛期运行水位实时动态控制模型,并采用防洪风险和兴利效益相结合的多目标综合评价指标体系,优选出了安康水库汛期运行水位动态控制方案。结果表明:实时动态控制方案在不降低原防洪标准的前提下与常规调度相比,在前汛期、主汛期和后汛期7日增加的发电量分别为2.94 MKW·h (2.88%)1.99 MKW·h (1.65%)2.98 MKW·h (2.67%),效益增加较为显著。
Abstract: Dynamic control of reservoir water level during flood season is one of the effective measures to solve the conflict between flood control and power generation. The dynamic control bound of water level for the Ankang reservoir is derived by risk-analysis based method, and dynamic control of water level operating scheme by considering flood forecasting information is established in this paper. By using multi-objective evaluation system which considers flood risk and power generation benefit, the dynamic control of water level operating schemes is proposed for the Ankang reservoir. Compared with the designed operation scheme, it is shown that the proposed scheme can increase hydropower generation by 2.94 MKW·h (2.88%), 1.99 MKW·h (1.65%) and 2.98 MKW·h (2.67%) in the pre-flood season, main flood season and post-flood season (7 days) without reducing flood control standards, respectively.
文章引用:杨光, 郭生练, 周研来. 安康水库汛期运行水位实时动态控制方案[J]. 水资源研究, 2013, 2(4): 248-254. http://dx.doi.org/10.12677/JWRR.2013.24035

参考文献

[1] 王本德, 周惠成, 张改红, 等. 水库汛限水位动态控制方法研究发展现状[J]. 南水北调与水利科技, 2007, 5(3): 43-45. WANG Bende, ZHOU Huicheng, ZHANG Gaihong, et al. Review on the dynamic control of reservoir normal level in flood season. South-to-North Water Transfers and Water Science and Technology, 2007, 5(3): 43-45. (in Chinese)
[2] 王本德, 周惠成. 水库汛限水位动态控制理论与方法及其应用[M]. 北京: 中国水利水电出版社, 2006. WANG Bende, ZHOU Huicheng. Reservoir flood water level dynamic control theory and its application. Beijing: China Water Conservancy and Hydropower Press, 2006. (in Chinese)
[3] 李玮, 郭生练, 刘攀. 水库汛限水位确定方法评述与展望[J]. 水力发电, 2005, 31(1): 66-70. LI Wei, GUO Shenglian and LIU Pan. A reservoir dynamic flood limited water level control method based on real-time forecasting information. Water Power, 2005, 31(1): 66-70. (in Chinese)
[4] 刘攀, 郭生练, 王才君, 等. 水库汛限水位实时动态控制模型研究[J]. 水力发电, 2005, 31(1): 8-11. LIU Pan, GUO Shenglian, WANG Caijun, et al. Real-time dynamic control model for reservoir flood limit water level operation. Water Power, 2005, 31(1): 8-11. (in Chinese)
[5] 周惠成, 李丽琴, 胡军, 等. 短期降雨预报在汛限水位动态控制中的应用[J]. 水力发电, 2005, 31(8): 22-26. ZHOU Huicheng, LI Liqin, HU Jun, et al. Dynamic control of reservoir normal level in flood season based on short-term rainfall forecast. Water Power, 2005, 31(8): 22-26. (in Chi-nese)
[6] MUROTA, A., ETOH, T. Application of the EQUI-risk line theory to the design of a detention reservoir. Natural Disaster Science, 1984, 6(1): 17-30.
[7] 周惠成, 张改红, 王本德, 等. 基于防洪预报调度调整水库汛限水位的研究[J]. 水力发电, 2006, 32(5): 14-17. ZHOU Huicheng, ZHANG Gaihong, WANG Bende, et al. Study on adjusting the limited level of reservoir during flood season based on flood control forecast. Water Power, 2006, 32(5): 14-17. (in Chinese)
[8] 刘攀, 郭生练, 王才君, 等. 三峡水库动态汛限水位与蓄水时机选定的优化设计[J]. 水利学报, 2004, 35(7): 86-91. LIU Pan, GUO Shenglian, Wang Caijun, et al. Optimization of limited water level in flood season and impounding scheme for reservoir in Three Gorges Project. Shuili Xuebao, 2004, 35(7): 86-91. (in Chinese)
[9] 陈炯宏, 郭生练, 刘攀, 等. 梯级水库汛限水位联合运用和动态控制研究[J]. 水力发电学报, 2012, 31(6): 55-61. CHEN Jionghong, GUO Shenglian, LIU Pan, et al. Joint operation and dynamic control of flood limited water levels for cascade reservoirs. Journal of Hydroelectric Engineering, 2012, 31 (6): 55-61. (in Chinese)
[10] 王才君, 郭生练, 刘攀, 等. 三峡水库汛期调度不确定性分析[J]. 水电自动化与大坝监测, 2004, 28(2): 71-74. WANG Caijun, GUO Shenglian, LIU Pan, et al. Analysis of uncertainty of three gorges reservoir operation during flood seasons. Hydropower Automation and Dam Monitoring, 2004, 28 (2): 71-74. (in Chinese)
[11] 朱元牲. 基于风险分析的防洪研究[J]. 河海大学学报, 2001, 29(4): 1-8. ZHU Yuansheng. Flood defense based on risk analysis. Journal of Hohai University, 2001, 29(4): 1-8. (in Chinese)
[12] 周之豪, 沈曾源, 施熙灿, 等. 水利水能规划[M]. 北京: 中国水利水电出版社, 1986. ZHOU Zhihao, SHEN Zengyuan, SHI Xican, et al. Planning of water resources and hydropower. Beijing: China Water Conservancy and Hydropower Press, 1986. (in Chinese)
[13] 李妍清, 郭生练, 周研来, 等. 汉江安康水库流域汛期分期研究[J]. 水资源研究, 2013, 2(1): 64-99. LI Yanqing, GUO Shenlian, ZHOU Yanlai, et al. Identification of flood seasonality for the Ankang reservoir basin. Journal of Water Resources Research, 2013, 2(1): 64-99. (in Chinese)