唐山湾国际旅游岛月岛度假区项目实施后的水交换能力研究
Research on the Ability of Water Exchange after the Implementation of Moon Island Tourist Resort Project in the Gulf of Tangshan International Tourism Island
DOI: 10.12677/AEP.2014.41B004, PDF, HTML,  被引量 下载: 2,391  浏览: 6,935 
作者: 焦润红*, 李 欣:交通运输部天津水运工程科学研究所,天津,中国;李晓冬:天津市永久医院,天津,中国
关键词: 旅游岛污染物扩散水交换Tourist Island; Pollutant Dispersion; Water Exchange
摘要:

文中通过潮流和污染物扩散方程的嵌套计算,模拟分析了唐山湾国际旅游岛月岛度假区项目考虑取沙与否两种方案下,月岛规划区内的水题交换能力。原控规方案水体交换能力和原控规取沙后方案相当,取沙后交换能力稍微优于取沙前。总体来说人工岛实施后两个方案水体交换能力很好,约72小时后,两个方案岛内主要水域的水体交换率均大于60%

By nested calculation of tidal flow and pollutant diffusion equation, and under the consideration of whether dredging sand or not of Moon Island Tourist Resort project in the Gulf of Tangshan international tourism island, this paper simulates and analyzes the water exchange capacity of this area. The water exchange ability of the original planning scheme agrees well with the dredging sand scheme, the exchange ability with the Dredging Sand Scheme is a bit better than before. In general, the water exchange ability of the two schemes after the artificial island putting into effect is very good, and about 72 hours later, the water exchange rates of the island’s main water area in two schemes are both greater than 60%.

Abstract:

文章引用:焦润红, 李晓冬, 李欣. 唐山湾国际旅游岛月岛度假区项目实施后的水交换能力研究[J]. 环境保护前沿, 2014, 4(1): 19-24. http://dx.doi.org/10.12677/AEP.2014.41B004

参考文献

[1] 王勇智, 谷东起, 王文海, 等 (2012) 唐山湾潟湖沙坝海域表层沉积物粒级及分布特征. 中国海洋大学学报, 42, 131-136.
[2] 刘新成, 卢永金, 等 (2006) 长江口和杭州湾潮流数值模拟及水体交换的定量研究. 水动力学研究与进展, 2, 171-180.
[3] 王 宏, 陈丕茂, 等 (2008) 海水交换能力的研究进展. 南方水产, 2, 75-79.
[4] 王昆, 郭楠, 等 (2013) 辽东湾水体交换能力模拟及保守水质模型应用. 水产科学, 8, 475-481.
[5] 董礼先, 苏纪兰 (1999) 象山港水交换数值研究I对流-扩散型的水交换模式. 海洋与湖沼, 4, 410-415.
[6] 何磊 (2004) 海湾水交换数值模拟方法研究. 天津大学, 机械工程学院, 天津.
[7] 娄海峰, 黄世昌, 等 (2005) 象山港内水体交换数值研究. 浙江水利科技, 4, 8-12.
[8] 蒋昌波, 李媛, 等 (2013) 铁山湾建港前后水体交换能力的数值模拟. 热带海洋学报, 1, 81-86.