鄱阳湖与长江干流洪水遭遇规律及风险分析
Flood Coincidence Risk Analysis for the Middle Yangtze River and Poyang Lake
DOI: 10.12677/JWRR.2014.36062, PDF, HTML,  被引量 下载: 2,642  浏览: 6,337  国家自然科学基金支持
作者: 李天元, 刘国强, 曾思栋:长江勘测规划设计研究院,武汉;郭生练, 刘章君:武汉大学水资源与水电工程科学国家重点实验室,武汉
关键词: 鄱阳湖长江干流洪水遭遇Copula函数Poyang Lake Middle Yangtze River Flood Coincidence Copula Function
摘要: 本文引入von Mises分布及其混合形式拟合年最大洪水发生时间与间隔时间,应用Copula函数分别构造汉口、湖口两站年最大洪水发生时间二维联合分布和年最大洪水发生时间(间隔时间)与洪水量级的三维联合分布,分析了研究两站年最大洪水在时间、量级及过程三个方面的遭遇风险。结果表明:鄱阳湖和长江年最大洪水在7月16日遭遇的可能性最大,约为0.058%,鄱阳湖和长江年最大7d洪水过程发生遭遇的概率为7.31%。研究可为鄱阳湖流域防洪规划制定和生态经济区建设提供科学依据。
Abstract: The von Mises distribution was used to fit the series of annual maximum flood occurrence and in-terval dates. The Copula functions were used to establish the bivariate joint distribution of annual maximum flood occurrence dates and the multivariate joint distribution of interval dates and flood magnitude. The flood coincidence risk of annual maximum flood occurrence date, flood magnitude and flood process were analyzed based on the data series of Hankou and Hukou hydrological stations. The results show that the highest flood coincidence risk of annual maximum flood occurrence date and 7-day flood process between the middle Yangtze River and Poyang Lake may reach to 0.058% (on July 16th) and 7.31% respectively during the flood season. The research can provide scientific basis for Poyang Lake basin on flood prevention planning and ecological- economic zone construction.
文章引用:李天元, 郭生练, 刘章君, 刘国强, 曾思栋. 鄱阳湖与长江干流洪水遭遇规律及风险分析[J]. 水资源研究, 2014, 3(6): 502-510. http://dx.doi.org/10.12677/JWRR.2014.36062

参考文献

[1] 赵英林, 王运辉. 洞庭湖设计洪水的分析与计算[J]. 水利学报, 1995, 10: 74-79. ZHAO Yinglin, WANG Yunhui. Design flood analysis and estimation for Dongting Lake. Journal of Hydraulic Engi-neering, 1995, 10: 74-79. (in Chinese)
[2] 肖天国. 金沙江、岷江洪水遭遇分析[J]. 人民长江, 2001, 32(1): 30-32. XIAO Tianguo. Floods encounter analysis for Jinsha River and Min River. Yangzte River, 2001, 32(1): 30-32. (in Chinese)
[3] 王政祥, 张明波. 南水北调中线水源与受水区降水丰枯遭遇分析[J]. 人民长江, 2008, 39(17): 103-105. WANG Zhengxiang, ZHANG Mingbo. Encounter probability analysis of rich-poor precipitation between water source area and water receiving areas in the Middle Route of South-to-North Water Transfer Project. Yangzte River, 2008, 39(17): 103-105. (in Chinese)
[4] 郭生练, 闫宝伟, 肖义, 等. Copula 函数在多变量水文分析计算中的应用及研究进展[J]. 水文, 2008, 28(3): 1-7. GUO Shenglian, YAN Baowei, XIAO Yi, et al. Application of Copula function in multivariate hydrological analysis and estimation. Journal of China Hydrology, 2008, 28(3): 1-7. (in Chinese)
[5] 王占海, 陈元芳, 黄琴, 等. M-Copula 函数在洪水遭遇中的应用研究[J]. 水电能源科学, 2009, 27(1): 69-73. WANG Zhanhai, CHEN Yuanfang, HUANG Qin, et al. Application study on M-Copula function in flood encounter. Water Resources and Power, 2009, 27(1): 69-73. (in Chinese)
[6] 闫宝伟, 郭生练, 陈璐, 等. 长江和清江洪水遭遇风险分析[J]. 水利学报, 2010, 41(4): 67-73. YAN Baowei, GUO Shenglian, CHEN Lu, et al. Flood encountering risk analysis for the Yangtze River and Qingjiang River. Journal of Hydraulic Engineering, 2010, 41(4): 67-73. (in Chinese)
[7] 闫宝伟, 郭生练, 余维. 长江和清江洪水过程遭遇风险分析[J]. 水力发电学报, 2013,32(1): 50-53. YAN Baowei, GUO Shenglian and YU Wei. Coincidence risk of flood hydrographs between Yangtze River and Qing River. Journal of Hydroelectric Engineering, 2013, 32(1): 50-53. (in Chinese)
[8] 陈璐, 郭生练, 张洪刚, 等. 长江上游干支流洪水遭遇分析[J]. 水科学进展, 2011, 22(3): 323-330. CHEN Lu, GUO Shenglian, ZHANG Honggang, et al. Flood coincidence probability analysis for the upstream Yangtze River and its tributaries. Advances in Water Science, 2011, 22(3): 323-330. (in Chinese)
[9] CHEN, L., SINGH, V. P., GUO, S. L., et al. Flood coincidence risk analysis using multivariate copula functions. Journal of Hydrologic Engineering, 2012, 17(6): 742-755.
[10] 李天元, 郭家力, 李雨. 长江上游与中游后汛期洪水遭遇规律研究[A]. 梯级水库群洪水资源调控与经济运行[C]. 北京: 中国水利水电出版社, 2012, 272-279. LI Tianyuan, GUO Jiali and LI Yu. Flood coincidence analysis for upstream and middle Yangtze River at the post flood season. Beijing: China Water Power Press, 2012, 272-279. (in Chinese)
[11] NELSON, R. B. An introduction to Copulas. New York: Springer, 1999.
[12] 方彬, 郭生练, 肖义, 等. 年最大洪水两变量联合分布研究[J]. 水科学进展, 2008, 19(4): 505-511. FANG Bin, GUO Shenglian, XIAO Yi, et al. Annual maximum flood occurrence dates and magnitudes frequency analysis based on bivariate joint distribution. Advances in Water Science, 2008, 19(4): 505-511. (in Chinese)