摘要:
本文针对江阴临港经济开发区岸线调整工程方案进行了研究。运用河道演变分析、河工模型试验相结合的方法就3种不同方案对河势、防洪、航运及重要涉水建筑物等方面可能产生的影响进行了对比研究,并提出了优化方案,为工程决策和设计提供参考依据。
The scheme of coastline adjustment project
of Lingang development zone in Jiangyin was studied in this paper. Methods of
river evolution analysis and river model test were used to study the possible
influence of three different schemes on river regime, flood control, shipping
and important wading buildings. Through research, an optimization scheme was
proposed; this paper also provides the reference for the engineering and
design.