Abstract:
Based on the analysis of ore properties of lead-containing molybdenum mine, and compared lead- suppression molybdenum-floating process with removal of lead from molybdenum after molybdenum lead mixing, this paper recommended the latter one to achieve the mine dressing index for 50.79% molybdenum concentrate grade, 81.57% molybdenum recovery, and 83.83% lead reco- very rate. This demonstrates the possibility of comprehensive recovery of lead in molybdenum mine and provides a scientific basis for enterprises to choose beneficiation process which can create greater economic and social benefits.