钱营孜煤矿采区集中石门过大断层支护技术研究
Study on Super-Large Fault Support Technology for Concentrated Shimen in Mining Area of Qianyingzi Coal Mine
DOI: 10.12677/ME.2017.54023, PDF, HTML, XML, 下载: 1,258  浏览: 2,711 
作者: 薛大伟*:皖北煤电集团钱营孜煤矿,安徽 宿州;杨 猛, 刘福民, 李 淋:中国矿业大学矿业工程学院,江苏 徐州
关键词: 断层支护注浆加固管缝式锚杆U型棚Fault Support Grouting Reinforcement Pipe-Joints Anchor U-Type Shed
摘要: 根据钱营孜煤矿断层条件及矿山生产过断层要求,研究提出一种超前管棚 + 管缝式锚杆超前支护作掩护技术,主要包括:采用管棚超前预注浆加固围岩、采用超前管缝锚杆 + U型棚支护方式控制顶板、设置围岩变形观测站。方案在钱营孜煤矿实际施工后表明:巷道变形小于20 mm,施工支护效果显著提高、施工进度加快50%,施工工期缩短明显、节约成本73万元,经济效益显著。
Abstract: According to the fault condition of Qianyingzi coal mine and mine production requirements, a kind of advanced pipe jacket and pipe anchor bolt advance protection technology is proposed. It mainly includes: the use of pipe roof advance pre-grouting to strengthen the surrounding rock, the use of advanced pipe-joints anchor and U-type shed support way to control the roof, setting the surrounding rock deformation observation station. The scheme after implementation shows that: the deformation of roadway is less than 20 mm; the construction support effect is improved obviously; the construction progress is accelerated by 50%; the construction period is shortened obviously; the cost saves 730,000 yuan; the economic benefit is remarkable.
文章引用:薛大伟, 杨猛, 刘福民, 李淋. 钱营孜煤矿采区集中石门过大断层支护技术研究[J]. 矿山工程, 2017, 5(4): 160-167. https://doi.org/10.12677/ME.2017.54023

参考文献

[1] 张文锡, 魏燕龙, 潘凡, 王占亭. 综采工作面过正断层期间的矿压规律[J]. 煤矿安全, 2016, 47(3): 205-208.
[2] 王新兴. 巷道过断层破碎带支护技术[J]. 煤矿安全, 2012, 43(10): 83-85.
[3] 李凯, 万振华, 李小昌, 谢君, 金志远. 复杂条件下综掘面过断层技术[J]. 煤矿安全, 2011, 42(3): 50-52.
[4] 孟庆彬, 韩立军, 齐彪, 文圣勇, 陈轲, 黄小忠, 孙茂贵. 复杂地质条件下巷道过断层关键技术研究及应用[J]. 采矿与安全工程学报, 2017, 34(2): 199-207.
[5] 闫帅, 柏建彪, 张自政, 童世杰, 吴明明. 含水层上巷道过断层围岩破坏机制及控制[J]. 采矿与安全工程学报, 2016, 33(6): 979-984, 991.
[6] 张欢. 断层带巷道支护技术研究及应用[D]: [硕士学位论文]. 淮南: 安徽理工大学, 2015.
[7] 史文豹, 李杨, 张振全, 李传明, 殷志强. 断层影响下巷道围岩的力学特征及支护研究[J]. 中国煤炭, 2016, 42(8): 35-38, 42.