复杂地形风电场后评估研究
Post-Evaluation of Wind Farms at Complex Terrains
DOI: 10.12677/SG.2017.75048, PDF, HTML, XML, 下载: 1,604  浏览: 2,883  国家自然科学基金支持
作者: 吴晓鹏:湘电风能有限公司风电研究院,湖南 湘潭;王地灵, 李 毅*:湖南科技大学土木工程学院,湖南 湘潭
关键词: 风电场后评估折减指标设计发电量Wind Farm Post Evaluation Reduction Index Design Capacity
摘要: 为提高风电场设计水平和降低风电企业投标经济风险,有必要对复杂地形风电场项目的风能资源进行后评估。本文首先确定了风电场后评估的技术指标。接着讨论了技术指标的相关影响因素。最终,基于某工程实例,采用后评估方法对该风电场设计阶段与运行阶段相关参数进行对比及分析,结果表明:风电场运行指标与设计指标最大误差不超过3.1%,本文提出的相关折减系数具有较好地适用性,可以为风电企业和投资方提供参考。
Abstract: Wind energy post-evaluation for the wind power projects of complex terrain can improve the design level of wind power plant and reduce finical risk for the bids. In this paper, technical index was firstly identified for the post-evaluation of wind energy. Moreover, the effect factors on the technical index were discussed. Finally, the post-evaluation method was adopted in a practical project to compare and analyze the relative parameters between the design stage and operated stage. The results show that the maximum error between the two stages is not greater than 3.1%, indicating that the reduction factors proposed in this paper is suitable for wind power industry and investment company.
文章引用:吴晓鹏, 王地灵, 李毅. 复杂地形风电场后评估研究[J]. 智能电网, 2017, 7(5): 435-442. https://doi.org/10.12677/SG.2017.75048

参考文献

[1] 杨振斌, 薛桁, 桑建国. 复杂地形风能资源评估初探[J]. 太阳能学报, 2004, 25(6): 744-749.
[2] 徐丹, 赵维, 姚曦宇. 复杂山地风电场的风能资源分析及评估[J]. 能源电力, 2015(12): 61-62.
[3] 全球风能理事会. 2008年全球风电市场统计[Z]. 2009.
[4] 张成, 吴达成, 邹天宇. 风电场运行状况后评估活动设计[J]. 阳光能源, 2015(12): 50-52.
[5] 张礼安, 李启华, 李刚, 等. 建设项目后评价方法和程序[J]. 经济评价, 2005, 13(11): 44-47.
[6] 杨威. 风电场设计后评估方法研究[D]: [硕士学位论文]. 北京: 华北电力大学, 2010.
[7] 某特定复杂地形风电场后评估. 湘电风能有限公司研究报告[R]. 2016.