|
[1]
|
LI, X., LI, T. J., WEI, J. H., et al. Hydro unit commitment via mixed integer linear programming: A case study of the Three Gorges Project, China. IEEE Transactions on Power Systems, 2014, 29(3): 1232-1241.
http://ieeexplore.ieee.org/abstract/document/6674108/ [Google Scholar] [CrossRef]
|
|
[2]
|
YAKOWITZ, S. Dynamic programming application in water re-sources. Water Resources Research, 1982, 18(4): 673-696.
https://agupubs.onlinelibrary.wiley.com/doi/abs/10.1029/WR018i004p00673 [Google Scholar] [CrossRef]
|
|
[3]
|
TURGEON, A. Optimal short-term hydro scheduling from the principle of progressive optimality. Water Resources Research, 1981, 17(3): 481-486. https://agupubs.onlinelibrary.wiley.com/doi/abs/10.1029/WR017i003p00481 [Google Scholar] [CrossRef]
|
|
[4]
|
LI, C. A., HSU, E., SVOBODA, A. J., TSENG, C. L. and JOHNSON, R. B. Hydro unit commitment in hydro-thermal optimization. IEEE Transactions on Power Systems, 1997, 12(2): 764-769. http://ieeexplore.ieee.org/document/589675/ [Google Scholar] [CrossRef]
|
|
[5]
|
SHAWWASH, Z. K., SIU, T. K. and RUSSELL, S. O. D. The BC hydro short term hydro scheduling optimization model. IEEE Transactions on Power Systems, 2000, 15(3): 1125-1131. http://ieeexplore.ieee.org/abstract/document/779402/ [Google Scholar] [CrossRef]
|
|
[6]
|
CATALAO, J. P. S., POUSINHO, H. M. I. and MENDES, V. M. F. Mixed-integer nonlinear programming approach for short-term hydro scheduling. IEEE Latin America Transactions, 2010, 8(6): 658-663.
http://ieeexplore.ieee.org/document/5688092/ [Google Scholar] [CrossRef]
|
|
[7]
|
CHANG, G. W., AGANAGIC, M., WAIGHT, J. G., et al. Experiences with mixed integer linear programming based approaches on short-term hydro scheduling. IEEE Transactions on Power Systems, 2001, 16(4): 743-749.
http://ieeexplore.ieee.org/abstract/document/962421/
|
|
[8]
|
依俊楠, 龚英, 刘攀. 基于混合整数线性规划的梯级水电站短期优化调度[J]. 水力发电, 2013, 39(10): 69-72.
YI Junjie, GONG Ying and LIU Pan. Optimal short-term hydro scheduling for cascade hydropower stations based on MILP. Water Power, 2013, 39(10): 69-72. (in Chinese)
|
|
[9]
|
WU, Y. G., HO, C. Y. and WANG, D. Y. A diploid genetic approach to short-term scheduling of hydro-thermal system. IEEE Transactions on Power Systems, 2000, 15(4): 1268-1274. http://ieeexplore.ieee.org/abstract/document/898100/
|
|
[10]
|
AMJADY, N., SOLEYMANPOUR, H. R. Daily hydrothermal generation scheduling by a new modified adaptive particle swarm optimization technique. Electric Power Systems Research, 2010, 80(6): 723-732.
https://www.sciencedirect.com/science/article/pii/S037877960900282X [Google Scholar] [CrossRef]
|
|
[11]
|
王金文, 范习辉, 张勇传, 等. 大规模水电系统短期调峰电量最大模型及其求解[J]. 电力系统自动化, 2003, 27(15): 29-34.
WANG Jinwen, FAN Xihui, ZHANG Yongchuan, et al. Short-term generation scheduling for the peak-energy maximization of large-scale hydropower systems. Automation of Electric Power Systems, 2003, 27(15): 29-34. (in Chinese)
|
|
[12]
|
GUAN, X. H., NI, E., LI, R. H. and LUH, P. B. An optimization-based algorithm for scheduling hydrothermal power systems with cascaded reservoirs and discrete hydro constraints. IEEE Transactions on Power Systems, 1997, 12(4): 1775-1780.
http://ieeexplore.ieee.org/document/627890/
|
|
[13]
|
唐新华, 周建军. 梯级水电群联合调峰调能数学模型[J]. 水力发电学报, 2013, 32(4): 38-45.
TANG Xinhua, ZHOU Jianjun. Peak-load and intermittent power regulations by cascade hydropower-models. Journal of Hydraulic Engineering, 2013, 32(4): 38-45. (in Chinese)
|
|
[14]
|
郭富强, 郭生练, 刘攀, 等. 清江梯级水电站实时负荷分配模型研究[J]. 水力发电学报, 2011, 30(1): 5-11.
GUO Fuqiang, GUO Shenglian, LIU Pan, et al. Real-time load distribution models for the Qingjiang cascade hydropower plants. Journal of Hydraulic Engineering, 2011, 30(1): 5-11. (in Chinese)
|
|
[15]
|
陶湘明, 陈森林, 董建凡. 水电站日典型负荷过程研究[J]. 中国农村水利水电, 2017(6): 184-186.
TAO Xiangming, CHEN Senlin and DONG Jianfan. Derivation of typical daily load process in hydropower stations. China Rural Water and Hydropower, 2017(6): 184-186. (in Chinese)
|
|
[16]
|
武新宇, 程春田, 申建建, 等. 大规模水电站群短期优化调度方法Ⅲ: 多电网调峰问题[J]. 水利学报, 2012, 43(1): 31-42.
WU Xinyu, CHENG Chuntian, SHEN Jianjian, et al. Short-term optimal operation methods of large-scale hydropower plants III: Solution method of peak load regulation for multiple power grid. Journal of Hydraulic Engineering, 2012, 43(1): 31-42. (in Chinese)
|
|
[17]
|
WU, X. Y., CHENG, C. T., SHEN, J. J., LUO, B., LIAO, S. L. and LI, G. A multi-objective short term hydropower scheduling model for peak shaving. Electrical Power & Energy Systems, 2015, 68: 278-293.
|
|
[18]
|
CHENG, C. T., SHEN, J. J. and WU, X. Y. Short-term scheduling for large-scale cascaded hydropower systems with multivibrationzones of high head. Journal of Water Resources Planning and Management, 2012, 138(3): 257-267. [Google Scholar] [CrossRef]
|