梯级水电站群短期发电调度计划快速生成方法
A Fast Algorithm for Short Term Scheduling of Cascaded Hydropower Reservoir Systems
DOI: 10.12677/JWRR.2018.73026, PDF,   
作者: 武新宇, 应其霖, 廖胜利, 申建建:大连理工大学水电与水信息研究所,辽宁 大连
关键词: 水电短期调度出力分配Hydropower Short Term Scheduling Power Allocation
摘要: 随着水电系统发展,发电计划制定面临着越来越复杂的需求。为避免求解复杂数学规划模型,本文提出一种快速生成梯级水电短期发电计划的方法。该方法不采用特定的目标函数,而是根据实际调度中普遍接受的降低耗水率、有利于负荷平衡、上下游水库协调等原则,在优化模型中采用的约束条件下制定发电计划。该方法由一系列满足调度期末水位、发电用水量、总电量,以及减少弃水的基本操作构成。根据负荷特性将时段排序,并结合能够满足时段关联约束的负荷分配算法,实现这些调度目标。以南方电网红水河梯级水电站群为背景的实例研究表明该方法能有效制定发电计划,并满足复杂的出力分配规则。
Abstract: With the development of hydropower systems, more and more complex demands are encountered by hydropower scheduling. To obtain near optimal schedules of hydropower systems effectively without solving complex mathematic programming, a fast algorithm is proposed. Without an objective function, the basic scheduling concepts of saving water, servicing for power system balance, coordination of up and down stream reservoirs, together with most of the constrains of optimization models, are used to direct the scheduling of cascaded hydropower systems. The method is composed of a series of operations for whole time horizon requirements such as final reservoir level, total energy or total turbine water of a plant, total energy of several cascaded reservoirs, and reducing spill water. To achieve one target, a successive power scheduling method is proposed in which temporal order of power rise/fall based on load characters and a local scheduling algorithm that can satisfy period coupled constraints are combined. Case study of hydropower system in Hongshui River operated by China Southern Power Grid (CSG) shows that the proposed method is effective in obtaining power schedules and complex power distribution rules can be achieved.
文章引用:武新宇, 应其霖, 廖胜利, 申建建. 梯级水电站群短期发电调度计划快速生成方法[J]. 水资源研究, 2018, 7(3): 236-250. https://doi.org/10.12677/JWRR.2018.73026

参考文献

[1] LI, X., LI, T. J., WEI, J. H., et al. Hydro unit commitment via mixed integer linear programming: A case study of the Three Gorges Project, China. IEEE Transactions on Power Systems, 2014, 29(3): 1232-1241. http://ieeexplore.ieee.org/abstract/document/6674108/ [Google Scholar] [CrossRef
[2] YAKOWITZ, S. Dynamic programming application in water re-sources. Water Resources Research, 1982, 18(4): 673-696. https://agupubs.onlinelibrary.wiley.com/doi/abs/10.1029/WR018i004p00673 [Google Scholar] [CrossRef
[3] TURGEON, A. Optimal short-term hydro scheduling from the principle of progressive optimality. Water Resources Research, 1981, 17(3): 481-486. https://agupubs.onlinelibrary.wiley.com/doi/abs/10.1029/WR017i003p00481 [Google Scholar] [CrossRef
[4] LI, C. A., HSU, E., SVOBODA, A. J., TSENG, C. L. and JOHNSON, R. B. Hydro unit commitment in hydro-thermal optimization. IEEE Transactions on Power Systems, 1997, 12(2): 764-769. http://ieeexplore.ieee.org/document/589675/ [Google Scholar] [CrossRef
[5] SHAWWASH, Z. K., SIU, T. K. and RUSSELL, S. O. D. The BC hydro short term hydro scheduling optimization model. IEEE Transactions on Power Systems, 2000, 15(3): 1125-1131. http://ieeexplore.ieee.org/abstract/document/779402/ [Google Scholar] [CrossRef
[6] CATALAO, J. P. S., POUSINHO, H. M. I. and MENDES, V. M. F. Mixed-integer nonlinear programming approach for short-term hydro scheduling. IEEE Latin America Transactions, 2010, 8(6): 658-663. http://ieeexplore.ieee.org/document/5688092/ [Google Scholar] [CrossRef
[7] CHANG, G. W., AGANAGIC, M., WAIGHT, J. G., et al. Experiences with mixed integer linear programming based approaches on short-term hydro scheduling. IEEE Transactions on Power Systems, 2001, 16(4): 743-749. http://ieeexplore.ieee.org/abstract/document/962421/
[8] 依俊楠, 龚英, 刘攀. 基于混合整数线性规划的梯级水电站短期优化调度[J]. 水力发电, 2013, 39(10): 69-72. YI Junjie, GONG Ying and LIU Pan. Optimal short-term hydro scheduling for cascade hydropower stations based on MILP. Water Power, 2013, 39(10): 69-72. (in Chinese)
[9] WU, Y. G., HO, C. Y. and WANG, D. Y. A diploid genetic approach to short-term scheduling of hydro-thermal system. IEEE Transactions on Power Systems, 2000, 15(4): 1268-1274. http://ieeexplore.ieee.org/abstract/document/898100/
[10] AMJADY, N., SOLEYMANPOUR, H. R. Daily hydrothermal generation scheduling by a new modified adaptive particle swarm optimization technique. Electric Power Systems Research, 2010, 80(6): 723-732. https://www.sciencedirect.com/science/article/pii/S037877960900282X [Google Scholar] [CrossRef
[11] 王金文, 范习辉, 张勇传, 等. 大规模水电系统短期调峰电量最大模型及其求解[J]. 电力系统自动化, 2003, 27(15): 29-34. WANG Jinwen, FAN Xihui, ZHANG Yongchuan, et al. Short-term generation scheduling for the peak-energy maximization of large-scale hydropower systems. Automation of Electric Power Systems, 2003, 27(15): 29-34. (in Chinese)
[12] GUAN, X. H., NI, E., LI, R. H. and LUH, P. B. An optimization-based algorithm for scheduling hydrothermal power systems with cascaded reservoirs and discrete hydro constraints. IEEE Transactions on Power Systems, 1997, 12(4): 1775-1780. http://ieeexplore.ieee.org/document/627890/
[13] 唐新华, 周建军. 梯级水电群联合调峰调能数学模型[J]. 水力发电学报, 2013, 32(4): 38-45. TANG Xinhua, ZHOU Jianjun. Peak-load and intermittent power regulations by cascade hydropower-models. Journal of Hydraulic Engineering, 2013, 32(4): 38-45. (in Chinese)
[14] 郭富强, 郭生练, 刘攀, 等. 清江梯级水电站实时负荷分配模型研究[J]. 水力发电学报, 2011, 30(1): 5-11. GUO Fuqiang, GUO Shenglian, LIU Pan, et al. Real-time load distribution models for the Qingjiang cascade hydropower plants. Journal of Hydraulic Engineering, 2011, 30(1): 5-11. (in Chinese)
[15] 陶湘明, 陈森林, 董建凡. 水电站日典型负荷过程研究[J]. 中国农村水利水电, 2017(6): 184-186. TAO Xiangming, CHEN Senlin and DONG Jianfan. Derivation of typical daily load process in hydropower stations. China Rural Water and Hydropower, 2017(6): 184-186. (in Chinese)
[16] 武新宇, 程春田, 申建建, 等. 大规模水电站群短期优化调度方法Ⅲ: 多电网调峰问题[J]. 水利学报, 2012, 43(1): 31-42. WU Xinyu, CHENG Chuntian, SHEN Jianjian, et al. Short-term optimal operation methods of large-scale hydropower plants III: Solution method of peak load regulation for multiple power grid. Journal of Hydraulic Engineering, 2012, 43(1): 31-42. (in Chinese)
[17] WU, X. Y., CHENG, C. T., SHEN, J. J., LUO, B., LIAO, S. L. and LI, G. A multi-objective short term hydropower scheduling model for peak shaving. Electrical Power & Energy Systems, 2015, 68: 278-293.
[18] CHENG, C. T., SHEN, J. J. and WU, X. Y. Short-term scheduling for large-scale cascaded hydropower systems with multivibrationzones of high head. Journal of Water Resources Planning and Management, 2012, 138(3): 257-267. [Google Scholar] [CrossRef