|
[1]
|
Abreu, C.F., May, J.H., Spangler, W.E., et al. (2008) Conflict Identification and Reconciliation in a Collaborative Manufacturing Scheduling Task. International Journal of Information Technology & Decision Making, 7, 147-174. [Google Scholar] [CrossRef]
|
|
[2]
|
Chen, W.J. (2009) Scheduling with Dependent Setups and Maintenance in a Textile Company. Computers & Industrial Engineering, 57, 867-873. [Google Scholar] [CrossRef]
|
|
[3]
|
Lee, C.H., Liao, C.J. and Chao, C.W. (2012) Scheduling with Multi-Attribute Setup Times. Computers & Industrial Engineering, 63, 494-502. [Google Scholar] [CrossRef]
|
|
[4]
|
Logendran, R., McDonell, B. and Smucker, B. (2007) Scheduling Unrelated Parallel Machines with Sequence-Dependent Setups. Computers & Operations Research, 34, 3420-3438. [Google Scholar] [CrossRef]
|
|
[5]
|
Chen, J.F. (2006) Minimization of Maximum Tardiness on Unrelated Parallel Machines with Process Restrictions and Setups. The International Journal of Advanced Manufacturing Technology, 29, 557-563. [Google Scholar] [CrossRef]
|
|
[6]
|
Abdekhodaee, A.H., Wirth, A. and Gan, H.S. (2006) Scheduling Two Parallel Machines with a Single Server: The General Case. Computers & Operations Research, 33, 994-1009. [Google Scholar] [CrossRef]
|
|
[7]
|
Chan, F.T.S. and Choy, K.L. (2011) A Genetic Algorithm-Based Scheduler for Multiproduct Parallel Machine Sheet Metal Job Shop. Expert Systems with Applications, 38, 8703-8715. [Google Scholar] [CrossRef]
|
|
[8]
|
Chuang, M.C., Liao, C.J. and Chao, C.W. (2010) Parallel Machine Scheduling with Preference of Machines. International Journal of Production Research, 48, 4139-4152. [Google Scholar] [CrossRef]
|
|
[9]
|
Sun, K. and Li, H. (2010) Scheduling Problems with Multiple Maintenance Activities and Non-Preemptive Jobs on Two Identical Parallel Machines. International Journal of Production Economics, 124, 151-158. [Google Scholar] [CrossRef]
|
|
[10]
|
Pinedo, M. (2012) Scheduling: Theory, Algorithms, and Systems. 3rd Edition, Springer, Berlin. [Google Scholar] [CrossRef]
|
|
[11]
|
Liao, C.J., Shyu, C.C. and Tseng, C.T. (2009) A Least Flexibility First Heuristic to Coordinate Setups in a Two- Or Three-Stage Supply Chain. International Journal of Production Economics, 117, 127-135. [Google Scholar] [CrossRef]
|
|
[12]
|
Gravel, M., Price, W.L. and Gagné, C. (2002) Scheduling Continuous Casting of Aluminum Using a Multiple Objective Ant Colony Optimization Metaheuristic. European Journal of Operational Research, 143, 218-229. [Google Scholar] [CrossRef]
|
|
[13]
|
Imran, A., Salhi, S. and Wassan, N.A. (2009) A Variable Neighborhood-Based Heuristic for the Heterogeneous Fleet Vehicle Routing Problem. European Journal of Operational Research, 197, 509-518. [Google Scholar] [CrossRef]
|
|
[14]
|
Hansen, P., Mladenović, N. and Pérez, J.A.M. (2010) Variable Neighbourhood Search: Methods and Applications. Annals of Operations Research, 175, 367-407. [Google Scholar] [CrossRef]
|