摘要:
南方电网所有直流输电系统中,±800 kV云广特高压直流首次使用了真空有载分接开关,本文首先介绍真空有载分接开关的工作过程,然后总结分析了云广±800 kV直流输电工程中换流变分接开关125℃闭锁调整的原因,对其存在的风险进行深入剖析,最后提出有效的处理措施,降低云广特高压直流输电系统闭锁的风险。
Abstract: Yunnan-Guangdong ±800 kV DC transmission project is the first project which uses vacuum on-load tap- changer in all DC transmission projects of CSG. The paper introduces the operation of vacuum on-load tap-changer firstly, then summarizes and analyzes the cause of converter transformer OLTC 125°C blocking in Yunnan-Guangdong ±800 kV DC transmission project, and analyzes its risk thoroughly, at last, some effective measures which can depress the risk of blocking both pole in Yunnan-Guangdong ±800 kV DC transmission project are given.
参考文献
[1]
|
袁清云. 特高压直流输电技术现状及在我国的应用前景[J]. 电网技术, 2005, 29(14): 1-3.
|
[2]
|
陈潜, 张尧, 钟庆等. ±800 kV特高压直流输电系统运行方式的仿真研究[J]. 继电器, 2007, 35(16): 27-32.
|
[3]
|
吴俊, 周剑, 苏寅生等. 云广±800 kV直流双极运行模式研究[J]. 南方电网技术, 2010, 4(4): 28-31.
|
[4]
|
张爱玲, 刘涛, 李少华. 云广特高压工程紧急停运及旁路开关操作控制策略研究[J]. 电力系统保护与控制, 2011, 39(13): 121-125.
|
[5]
|
王瑶. 特高压直流输电控制与保护技术的研究[J]. 电力系统保护与控制, 2009, 37(15): 53-58.
|
[6]
|
浙江大学直流输电科研组. 直流输电[M]. 北京: 水利电力出版社, 1985: 120-135.
|