哈密–郑州±800 kV直流输电工程换流站无功补偿研究
Study on Reactive Power Compensation Scheme for Converter Station of Hami-Zhengzhou ±800 kV DC Transmission Project
DOI: 10.12677/SG.2013.31005, PDF, HTML, 下载: 3,875  浏览: 12,549 
作者: 牛 涛*, 钱康:江苏省电力设计院,南京;张英娇:南京市供电公司,南京
关键词: 特高压直流换流站无功补偿UHVDC; Converter Station; Reactive Power Compensation
摘要: 换流站无功补偿的研究是特高压直流设计的重要组成部分。本文以哈密–郑州±800 kV直流输电工程为例,按照相应的计算原则计算了不同运行方式下的换流站无功消耗,研究了两端换流站的无功补偿总容量和小组容量要求,在此基础上提出了换流站的无功补偿设备配置方案。
Abstract: The research on reactive power compensation of converter station is an important component in the design of UHVDC project. Taking ±800 kV DC project from Hami to Zhengzhou for example, the reactive power consumption of converter station under different operating modes is calculated according to corresponding calculation principle. Then the total capacity of reactive power compensation devices of converter stations at both terminals and the group capacity are researched. Based on results of calculation and analysis, a configuration scheme of reactive power compensation devices is proposed.
文章引用:牛涛, 钱康, 张英娇. 哈密–郑州±800 kV直流输电工程换流站无功补偿研究[J]. 智能电网, 2013, 3(1): 28-31. http://dx.doi.org/10.12677/SG.2013.31005

参考文献

[1] 杜忠明. 贵广第二回直流输电工程换流站无功补偿的研究[J]. 电网技术, 2006, 30(10): 69-74.
[2] 刘振亚. 特高压直流输电技术研究成果专辑(2005年)[M]. 北京: 中国电力出版社, 2006.
[3] 赵畹君. 高压直流输电工程技术[M]. 北京: 中国电力出版社, 2004.
[4] 袁清云. 特高压直流输电技术现状及在我国的应用前景[J]. 电网技术, 2005, 29(14): 1-3.
[5] 金小明, 赵勇, 伍文城, 钟杰峰. 云广±800 kV直流输电工程换流站无功配置研究[J]. 南方电网技术, 2010, 4(4): 14-18.
[6] 王峰, 徐政, 黄莹等. 高压直流输电无功管理的原则与算法[J]. 电力系统自动化, 2008, 32(4): 85-88.
[7] DL/T 5223-2005, 高压直流换流站设计技术规定[S].
[8] 殷威扬, 杨志栋. 特高压直流工程无功平衡和补偿策略[J]. 高电压技术, 2006, 32(9): 50-54.