作者: 田 磊:深圳供电规划设计院有限公司,深圳
关键词: RTKPPK像控点RTK PPK Photo Control Point
摘要: 结合500 kV上寨至博罗架空输电线路工程的特点,依据RTK(Real Time Kinematic)与PPK(Post Processing Kinematic)的基本原理及优缺点,将两者有效的结合,实现了对航空摄影测量中电台信号遮蔽区域的像控点的全覆盖测量。同时保证了测量精度,提高了测量效率,节省了人力物力。
Abstract: According to characteristics of 500 kV Shangzhai-Boluo power transmission line project, combined with the basic principles of Real Time Kinematic (RTK) & the Post Processing Kinematic (PPK) and their advantages & disadvantages, full-coverage measurement for photo control point in area cov-ered by radio signal was implemented in the process of aerophotography. At the same time, the ac-curacy and efficiency of measurement were ensured; working capacity and resources were saved.
文章引用:田磊. RTK与PPK技术在电力工程中的应用[J]. 测绘科学技术, 2014, 2(4): 44-48. http://dx.doi.org/10.12677/GST.2014.24008