[1]
|
郑守仁. 三峡工程设计水位175 m试验性蓄水运行的相关问题思考[J]. 人民长江, 2011, 42(13): 1-7.
ZHENG Shouren. Some considerations on related problems in pilot impoundment of TGP at design water level of 175 m. Yangtze River, 2011, 42(13): 1-7. (in Chinese)
|
|
[2]
|
闵要武, 张俊, 邹红梅. 基于来水保证率的三峡水库蓄水调度图研究[J]. 水文, 2011, 31(3): 27-30.
MIN Yaowu, ZHANG Jun and ZOU Hongmei. Research on impounding schemes for the Three Gorges Reservoir based on inflow guaranteed frequency. Journal of Hydrology, 2011, 31(3): 27-30. (in Chinese)
|
|
[3]
|
彭杨, 李义天, 张红武. 三峡水库汛末蓄水时间与目标决策研究[J]. 水科学进展, 2003, 14(6): 682-689.
PENG Yang, LI Yitian and ZHANG Hongwu. Study on the impounding time and objective decision of the Three Gorges Reservoir at the end of flood period. Advances in Water Science, 2003, 14(6): 682-689. (in Chinese)
|
|
[4]
|
李义天, 甘富万, 邓金运. 三峡水库9月分旬控制蓄水初步研究[J]. 水力发电学报, 2006, 25(1): 61-66.
LI Yitian, GAN Fuwan and DENG Jinyun. Preliminary study on impounding water of Three Gorges Project in September. Journal of Hydroelectric Engineering, 2006, 25(1): 61-66. (in Chinese)
|
|
[5]
|
刘攀, 郭生练, 庞博, 等. 三峡水库运行初期蓄水调度函数的神经网络模型研究及改进[J]. 水力发电学报, 2006, 25(2): 83-89.
LIU Pan, GUO Shenglian, PANG Bo, et al. A modified approach for deriving storage operating rules of the Three Gorges reservoir with artificial neural network. Journal of Hydroelectric Engineering, 2006, 25(2): 83-89. (in Chinese)
|
|
[6]
|
邓金运, 李义天, 陈建, 等. 泥沙淤积对三峡水库9月分旬蓄水的影响[J]. 水力发电学报, 2008, 27(3): 110-114.
DENG Jinyun, LI Yitian, CHEN Jian, et al. Preliminary study on impounding water of Three Gorges Project in September. Journal of Hydraulic Engineering, 2008, 27(3): 110-114. (in Chinese)
|
|
[7]
|
刘心愿, 郭生练, 刘攀, 等. 考虑综合利用要求的三峡水库提前蓄水方案[J]. 水科学进展, 2009, 20(6): 851-856.
LIU Xinyuan, GUO Shenglian, LIU Pan, et al. Scheme of im-pounding in advance for the Three Gorges Reservoir by considering the comprehensive utilization benefits. Advance in Water Science, 2009, 20(6): 851-856. (in Chinese)
|
|
[8]
|
水利部. 三峡水库优化调度方案[R], 2009.
The Ministry of Water Resources of People’s Republic of China. Scheme of optimal operation for the Three Gorges Reservoir, 2009. (in Chinese)
|
|
[9]
|
张娟, 张艾东, 蔡治国. 三峡水库汛期分期成因分析与模型计算[J]. 人民长江, 2008, 39(18): 4-5.
ZHANG Juan, ZHANG Aidong and CAI Zhiguo. Hydrological genetic analysis and model calculation of division of flood period for the Three Gorges Reservoir. Yangtze River, 2008, 39(18): 4-5. (in Chinese)
|
|
[10]
|
XIONG, L. H., GUO, S. L. Trend test and change-point detection for the annual discharge series of the Yangtze River at the Yichang hydrological station. Hydrological Sciences Journal 2004, 49(1): 99-112.
|
|
[11]
|
肖义, 郭生练, 熊立华, 等. 一种新的洪水过程随机模拟方法研究[J]. 四川大学学报(工程科学版), 2007, 39(2): 55-60.
XIAI Yi, GUO Shenglian, XIONG Lihua, et al. A new random simulation method for constructing synthetic flood hydrographs. Journal of Sichuan University (Engineering Science Edition), 2007, 39(2): 55-60. (in Chinese)
|
|
[12]
|
水利部. 水利水电工程水文计算规范SL278—2002[S]. 北京: 水利水电出版社, 2002.
The Ministry of Water Resources of People’s Republic of China. Standard for hydrological information and hydrological forecasting (SL278—2002), 2002. (in Chinese)
|
|
[13]
|
李雨, 郭生练, 郭海晋, 等. 三峡水库提前蓄水的防洪风险与效益分析[J]. 长江科学院院报, 2013, 30(1): 8-14.
LI Yu, GUO Shenglian, GUO Haijin, et al. Flood control risk and benefit of impounding water in advance for the Three Gorges Reservoir. Journal of Yangtze River Scientific Research Institute, 2013, 30(1): 8-14. (in Chinese)
|