深大基坑开挖对石家庄地铁3号线的变形研究
Study on the Deformation Characteristics of Deep Foundation Pit Excavation on Shijiazhuang Metro Line 3
摘要: 为探究新建深大基坑对既有区间隧道的影响,本文以石家庄地铁3号线新百广场站–东里区间为研究对象,采用迈达斯数值模拟软件,建立了基坑–地层–隧道的三维有限元模型,再结合现场实测数据,且验证模型后,指出了新建基坑开挖过程中隧道的变形规律及机理,旨在为类似工程提供参考,确保隧道的结构安全和正常运营。
Abstract: In order to explore the influence of the new deep foundation pit on the existing tunnel, this paper takes the Xinbai Square Station-Dongli section of Shijiazhuang Metro Line 3 as the research object, and uses Midas numerical simulation software to establish a three-dimensional finite element model of foundation pit-formation-tunnel. After combining the field-measured data and verifying the model, the deformation law and mechanism of the tunnel during the excavation of the new foundation pit are pointed out, which aims to provide a reference for similar projects and ensure the structural safety and normal operation of the tunnel.
参考文献
|
[1]
|
阮恒丰, 梁荣柱, 康成, 等. 旁侧基坑开挖对地铁盾构隧道影响的精细化数值模拟研究[J]. 隧道建设(中英文), 2024, 44(S2): 245-255.
|
|
[2]
|
杨长京. 顶部基坑开挖对既有地铁隧道的影响研究[J]. 施工技术(中英文), 2025, 54(9): 106-110.
|
|
[3]
|
陈长青. 深基坑施工对近邻建(构)筑物影响机理及监测分析[D]: [硕士学位论文]. 长沙: 长沙理工大学, 2012.
|
|
[4]
|
吉茂杰, 刘国彬. 开挖卸荷引起地铁隧道位移预测方法[J]. 同济大学学报, 2001, 29(5): 531-535.
|
|
[5]
|
张治国, 黄茂松, 王卫东. 邻近开挖对既有软土隧道的影响[J]. 岩土力学, 2009, 30(5): 1373-1380.
|
|
[6]
|
魏纲, 赵城丽. 基坑开挖引起临近隧道的附加荷载计算方法[J]. 岩石力学与工程学报, 2016, 35(S1): 3408-3417.
|
|
[7]
|
周泽林, 陈寿根, 陈亮, 等. 基坑施工对下卧地铁隧道上抬变形影响的简化理论分析[J]. 岩土工程学报, 2015, 37(12): 2224-2234.
|
|
[8]
|
高祥志, 姚爱军, 李彦霖, 等. 超大直径盾构下穿交通枢纽变形特征与控制[J]. 公路, 2024, 69(4): 387-394.
|
|
[9]
|
Gao, X.Z. and Yao, A.J. (2024) Deformation Characteristics and Instability Mechanism of Transportation Hub under Downward Traversal Conditions of the Double-Track Super-Large Diameter Shield Tunnel. Geohazard Mechanics, 2, 131-142. https://doi.org/10.1016/j.ghm.2024.03.005
|
|
[10]
|
韩国俊, 刘洋, 邢如飞. 道路施工对下方地铁隧道的沉降影响分析[J]. 铁道标准设计, 2012(S1): 97-100.
|