|
[1]
|
纪先志, 周广良. 全预制装配式高层住宅楼的施工及质量控制[J]. 山西建筑, 2013, 39(18): 72-75.
|
|
[2]
|
Cheng, F. (2017) Research on Construction Quality and Improvement of Assembly Construction. IOP Conference Series: Earth and Environmental Science, 94, Article ID: 012092. https://doi.org/10.1088/1755-1315/94/1/012092
|
|
[3]
|
Chen, X.G. and Jiang, Y. (2025) Research on Quality Control and Efficiency Improvement of Prefabricated Concrete Structures in High-Rise Building Construction. Industry Science and Engineering, 2, 27-30. https://doi.org/10.62381/i255905
|
|
[4]
|
Ma, W.D. (2025) Improvement of Waterproof Performance at Joints of Prefabricated Concrete Components in Prefabricated Buildings and Construction Quality Control System Construction. Academic Journal of Architecture and Geotechnical Engineering, 7, 95-101.
|
|
[5]
|
Chen, H., Wang, D., Lei, M. and Xu, C. (2025) Application of Prefabricated Building Construction Technology in the Construction Management of Construction Engineering. International Core Journal of Engineering, 11, 143-149.
|
|
[6]
|
陈凯, 黄立奎. 装配式混凝土住宅建筑工程施工技术研究[J]. 居舍, 2026(5): 65-68.
|
|
[7]
|
李晓杰. 全预制装配式车站拼装工艺与防水注浆施工关键技术[J]. 铁道建筑技术, 2026(7): 150-154.
|
|
[8]
|
韩昭, 张延兵. 灌浆套筒在装配式混凝土结构中的施工工艺[J]. 建材发展导向, 2026, 24(3): 91-93.
|
|
[9]
|
He, Z. (2026) Analysis of Construction Technical Points of Prefabricated Buildings. Forum on Research and Innovation Management, 4, 40-42.
|
|
[10]
|
白志强, 李安鑫. 装配式建筑施工技术的应用问题及改进措施[J]. 建设机械技术与管理, 2026, 39(1): 163-165.
|
|
[11]
|
聂华, 田凯. 装配式构件深化设计及施工关键技术研究[J]. 砖瓦, 2026(4): 148-150.
|
|
[12]
|
白松豪. 装配式项目预制构件的吊装施工与连接研究[J]. 中国建筑金属结构, 2026, 25(6): 64-66.
|
|
[13]
|
孙清义. 装配式建筑房建施工关键技术研究[J]. 中国建筑装饰装修, 2026(6): 169-171.
|
|
[14]
|
Qi, B.K. and Li, C.F. (2014) Whole Life Cycle Management of Prefabricated Construction Research Based on BIM Technology. Applied Mechanics and Materials, 536, 1705-1708. https://doi.org/10.4028/www.scientific.net/amm.536-537.1705
|
|
[15]
|
舒欣, 张奕. 基于BIM技术的装配式建筑设计与建造研究[J]. 建筑结构, 2018, 48(23): 123-126, 91.
|
|
[16]
|
Liu, H., Sydora, C., Altaf, M.S., Han, S. and Al-Hussein, M. (2019) Towards Sustainable Construction: Bim-Enabled Design and Planning of Roof Sheathing Installation for Prefabricated Buildings. Journal of Cleaner Production, 235, 1189-1201. https://doi.org/10.1016/j.jclepro.2019.07.055
|
|
[17]
|
Yoo, M., Kim, J. and Choi, C. (2019) Effects of Bim-Based Construction of Prefabricated Steel Framework from the Perspective of SMEs. Applied Sciences, 9, 1732. https://doi.org/10.3390/app9091732
|
|
[18]
|
Ji, Y., Qi, K., Qi, Y., Li, Y., Li, H.X., Lei, Z., et al. (2020) Bim-Based Life-Cycle Environmental Assessment of Prefabricated Buildings. Engineering, Construction and Architectural Management, 27, 1703-1725. https://doi.org/10.1108/ecam-01-2020-0017
|
|
[19]
|
Bi, W.Z. (2021) Research on the Way of Prefabricated Building Information Sharing Based on Computer Software Bim. Journal of Physics: Conference Series, 1744, Article ID: 022078. https://doi.org/10.1088/1742-6596/1744/2/022078
|
|
[20]
|
马琦越, 史小右, 靳惠文, 等. BIM技术在装配式建筑施工及运维阶段的应用[C]//《施工技术》杂志社, 亚太建设科技信息研究院有限公司. 2023年全国土木工程施工技术交流会论文集(中册). 北京: 中国建筑一局(集团)有限公司, 2023: 189-192.
|
|
[21]
|
亢磊磊, 吕秋林, 屈芝茗, 等. 基于BIM的装配式建筑分析[J]. 中国建筑装饰装修, 2023(22): 118-120.
|
|
[22]
|
Li, S., Li, S., Hu, J., Shi, Y., Li, H., Chen, A., et al. (2023) Intelligent Modeling of Edge Components of Prefabricated Shear Wall Structures Based on Bim. Buildings, 13, Article 1252. https://doi.org/10.3390/buildings13051252
|
|
[23]
|
Nguyen, D., Jeon, C., Roh, G. and Shim, C. (2024) Bim-Based Preassembly Analysis for Design for Manufacturing and Assembly of Prefabricated Bridges. Automation in Construction, 160, Article ID: 105338. https://doi.org/10.1016/j.autcon.2024.105338
|
|
[24]
|
Zhao, L. (2024) Research on the Bill of Quantities Pricing Model for Prefabricated Buildings Based on Bim. Journal of Engineering Research and Reports, 26, 95-105. https://doi.org/10.9734/jerr/2024/v26i121343
|