|
[1]
|
Lenstra, J.K., Rinnooy Kan, A.H.G. and Brucker, P. (1977) Complexity of Machine Scheduling Problems. Annals of Discrete Mathematics, 1, 343-362. https://doi.org/10.1016/s0167-5060(08)70743-x
|
|
[2]
|
Yin, Y., Cheng, S., Cheng, T.C.E., Wu, C. and Wu, W. (2012) Two-Agent Single-Machine Scheduling with Assignable Due Dates. Applied Mathematics and Computation, 219, 1674-1685. https://doi.org/10.1016/j.amc.2012.08.008
|
|
[3]
|
Liu, P., Yi, N., Zhou, X. and Gong, H. (2013) Scheduling Two Agents with Sum-of-Processing-Times-Based Deterioration on a Single Machine. Applied Mathematics and Computation, 219, 8848-8855. https://doi.org/10.1016/j.amc.2013.03.040
|
|
[4]
|
He, C. and Leung, J.Y.T. (2016) Two-Agent Scheduling of Time-Dependent Jobs. Journal of Combinatorial Optimization, 34, 362-377. https://doi.org/10.1007/s10878-016-9994-y
|
|
[5]
|
Zhang, X.G. and Wang, Y. (2016) Two-Agent Scheduling Problems on a Single-Machine to Minimize the Total Weighted Late Work. Journal of Combinatorial Optimization, 33, 945-955. https://doi.org/10.1007/s10878-016-0017-9
|
|
[6]
|
Yu, J., Liu, P. and Lu, X. (2023) Two-Agent Single-Machine Scheduling with Release Dates to Minimize the Makespan. Optimization Letters, 17, 1915-1937. https://doi.org/10.1007/s11590-022-01967-6
|
|
[7]
|
Dyer, M.E. and Wolsey, L.A. (1990) Formulating the Single Machine Sequencing Problem with Release Dates as a Mixed Integer Program. Discrete Applied Mathematics, 26, 255-270. https://doi.org/10.1016/0166-218x(90)90104-k
|
|
[8]
|
Hsu, C., Low, C. and Su, C. (2010) A Single-Machine Scheduling Problem with Maintenance Activities to Minimize Makespan. Applied Mathematics and Computation, 215, 3929-3935. https://doi.org/10.1016/j.amc.2009.11.040
|
|
[9]
|
Zhao, C. and Tang, H. (2010) Single Machine Scheduling with General Job-Dependent Aging Effect and Maintenance Activities to Minimize Makespan. Applied Mathematical Modelling, 34, 837-841. https://doi.org/10.1016/j.apm.2009.07.002
|
|
[10]
|
Hfaiedh, W., Sadfi, C., Kacem, I. and Hadj-Alouane, A. (2015) A Branch-and-Bound Method for the Single-Machine Scheduling Problem under a Non-Availability Constraint for Maximum Delivery Time Minimization. Applied Mathematics and Computation, 252, 496-502. https://doi.org/10.1016/j.amc.2014.11.103
|
|
[11]
|
Lee, W., Chung, Y. and Huang, Z. (2013) A Single-Machine Bi-Criterion Scheduling Problem with Two Agents. Applied Mathematics and Computation, 219, 10831-10841. https://doi.org/10.1016/j.amc.2013.05.025
|
|
[12]
|
Luo, X. and Chu, F. (2006) A Branch and Bound Algorithm of the Single Machine Schedule with Sequence Dependent Setup Times for Minimizing Total Tardiness. Applied Mathematics and Computation, 183, 575-588. https://doi.org/10.1016/j.amc.2006.05.127
|