矿用本安型红外双目围岩位移检测仪的研发与工程应用研究
Research on the Development and Engineering Application of Intrinsically Safe Infrared Binocular Surround Rock Displacement Detector for Mining
DOI: 10.12677/gst.2026.144034, PDF,   
作者: 张立强*:西安腾盛山特智能科技有限公司,陕西 西安;陕西蒲白矿山支护有限公司,陕西 渭南;王贝贝, 周翰源:西安腾盛山特智能科技有限公司,陕西 西安
关键词: 矿用本安型设备;红外双目视觉;围岩位移监测;毫米级精度;巷道全生命周期管理;Mine Intrinsically Safe Equipment; Infrared Dual-Camera Vision; Surrounding Rock Displacement Monitoring; Millimeter-Level Accuracy; Full Life Cycle Management of the Roadway
摘要: 针对煤矿井下巷道围岩变形人工测定中存在的精度不足、效率偏低、时效性差和数据难以统一管理等问题,本文研发矿用本安型红外双目围岩位移检测仪并构建工程应用方案。系统采用“红外双目成像–相机标定与立体校正–立体匹配与亚像素视差求解–三维重建–重复测量与鲁棒异常值剔除–位移解算–平台预警”的技术路线,将现场快速采集、边缘计算、无线传输与巷道全生命周期管理相结合。现场工程验证结果表明,在现有已测试工况下,检测仪测量误差均值约为3 mm、最大误差约为4 mm;单条巷道测量由传统方式的2人约10 h缩短为1人约0.5 h。与固定式机器视觉系统、地面三维激光扫描和光纤布拉格光栅传感等代表性技术相比,本装置的主要优势在于便携、非接触、本安设计和数据闭环集成。
Abstract: To address the limited accuracy, low efficiency, poor timeliness, and fragmented data management of manual roadway deformation measurement in underground coal mines, an intrinsically safe infrared binocular surrounding-rock displacement detector and an engineering application scheme were developed. The system follows a workflow of infrared binocular imaging, camera calibration and stereo rectification, stereo matching with subpixel disparity estimation, three-dimensional reconstruction, repeated measurement with robust outlier rejection, displacement calculation, and platform-based warning. Field tests under the currently verified conditions show a mean measurement error of approximately 3 mm and a maximum error of approximately 4 mm. The time required for one roadway was reduced from about 10 h with two workers using conventional methods to about 0.5 h with one operator. Compared with representative fixed machine-vision systems, terrestrial laser scanning, and fiber Bragg grating sensing, the proposed device emphasizes portability, non-contact measurement, intrinsic-safety-oriented design, and closed-loop data integration.
文章引用:张立强, 王贝贝, 周翰源. 矿用本安型红外双目围岩位移检测仪的研发与工程应用研究[J]. 测绘科学技术, 2026, 14(4): 338-348. https://doi.org/10.12677/gst.2026.144034

参考文献

[1] 国家市场监督管理总局, 国家标准化管理委员会. GB/T 3836.1-2021爆炸性环境 第1部分: 设备 通用要求[S]. 北京: 中国标准出版社, 2021.
[2] 国家市场监督管理总局, 国家标准化管理委员会. GB/T 3836.4-2021爆炸性环境 第4部分: 由本质安全型“I”保护的设备[S]. 北京: 中国标准出版社, 2021.
[3] 国家市场监督管理总局, 国家标准化管理委员会. GB/T 35056-2018煤矿巷道锚杆支护技术规范[S]. 北京: 中国标准出版社, 2018.
[4] 国家煤矿安监局关于印发《防治煤矿冲击地压细则》的通知[EB/OL].
https://www.mem.gov.cn/gk/tzgg/tz/201805/t20180508_230518.shtml, 2018-05-02.
[5] Xu, J., Wang, E. and Zhou, R. (2020) Real-Time Measuring and Warning of Surrounding Rock Dynamic Deformation and Failure in Deep Roadway Based on Machine Vision Method. Measurement, 149, Article 107028.
https://doi.org/10.1016/j.measurement.2019.107028
[6] Qiu, Z., Li, H., Hu, W., Wang, C., Liu, J. and Sun, Q. (2018) Real-Time Tunnel Deformation Monitoring Technology Based on Laser and Machine Vision. Applied Sciences, 8, Article 2579.
https://doi.org/10.3390/app8122579
[7] Wang, C., Xu, S., Li, W., Wang, Y., Song, A. and Xing, F. (2026) Novel Method for Regional Surface Displacement Measurement of Coal Mine Roadway under Different Typical Working Conditions Based on 3D Laser Scanning Technique. Measurement, 261, Article 119870.
https://doi.org/10.1016/j.measurement.2025.119870
[8] Štroner, M., Urban, R., Křemen, T., Braun, J., Michal, O. and Jiřikovský, T. (2025) Scanning the Underground: Comparison of the Accuracies of SLAM and Static Laser Scanners in a Mine Tunnel. Measurement, 242, Article 115875.
https://doi.org/10.1016/j.measurement.2024.115875
[9] 柴敬, 王佳琪, 杨健锋, 等. 区段煤柱变形光纤光栅监测应用研究[J]. 煤炭科学技术, 2024, 52(1): 126-137.
[10] Cai, H., Xiao, X., Song, Q., Sun, Q. and Yan, Z. (2023) Fiber Bragg Grating Displacement Sensor Based on Synchronous Deformation Sensing for Real-Time Monitoring of a Tunnel Lining. Applied Optics, 62, 8299-8307.
https://doi.org/10.1364/ao.504651
[11] FARO Technologies (2022) Focus Premium Specifications.
https://media.faro.com/-/media/Project/FARO/FARO/FARO/Resources/1_BROCHURE/2022/FARO-Sphere/PSA_Focus-Premium/4036_Brochure_FocusPremium_PSA_ENG_A4.pdf
[12] 同济大学采购与招标管理办公室. 三维激光扫描仪采购项目中标公告[EB/OL].
https://czb.tongji.edu.cn/sggl/cgw/jggsNews.jsp?type=A&wid=202411060134179122, 2024-11-21.
[13] 华北电力大学. 光纤光栅传感系统项目中标公告[EB/OL].
https://www.anfangzb.com/view/537/KrWCUoUBzcw65Br6SBVr.html, 2022-12-27.
[14] Hartley, R. and Zisserman, A. (2004) Multiple View Geometry in Computer Vision. 2nd Edition, Cambridge University Press.
https://doi.org/10.1017/cbo9780511811685
[15] Zhang, Z. (2000) A Flexible New Technique for Camera Calibration. IEEE Transactions on Pattern Analysis and Machine Intelligence, 22, 1330-1334.
https://doi.org/10.1109/34.888718
[16] Scharstein, D. and Szeliski, R. (2002) A Taxonomy and Evaluation of Dense Two-Frame Stereo Correspondence Algorithms. International Journal of Computer Vision, 47, 7-42.
https://doi.org/10.1023/a:1014573219977
[17] Hirschmuller, H. (2008) Stereo Processing by Semiglobal Matching and Mutual Information. IEEE Transactions on Pattern Analysis and Machine Intelligence, 30, 328-341.
https://doi.org/10.1109/tpami.2007.1166
[18] 关于陕投集团陕西麟北煤业开发有限责任公司永陇矿区园子沟煤矿(800万吨/年)环境影响报告书的批复[EB/OL].
https://www.mee.gov.cn/xxgk2018/xxgk/xxgk11/202310/t20231008_1042560.html, 2023-10-07.
[19] 张嵘. 园子沟煤矿大跨度切巷围岩控制技术研究[D]: [硕士学位论文]. 徐州: 中国矿业大学, 2020.
[20] 胡红利. 园子沟煤矿东翼二号回风大巷软岩巷道修复技术实践[J]. 内蒙古煤炭经济, 2017(10): 129-131.