|
[1]
|
Watanabe, K. (1998) Prediction of evolution in time of dynamic behaviour of wood structure. The 5th World Conference on Timber Engineering, 2, 11-17.
|
|
[2]
|
SФensen, J.D., Svensson, S. and Stang, B.D. (2005) Reliability-based ca-libration of load duration factors for timber structures. Structural Safety, 27, 153-169. http://dx.doi.org/10.1016/j.strusafe.2004.10.001 [Google Scholar] [CrossRef]
|
|
[3]
|
Rosowskya, D.V. and Bulleit, W.M. (2002) Load duration effects in wood members and connections: order statistics and critical loads. Structural Safety, 24, 347-362. http://dx.doi.org/10.1016/S0167-4730(02)00031-0 [Google Scholar] [CrossRef]
|
|
[4]
|
Leicester, R.H., Cole, I.S., Foliente, G.C., et al. (1998) Prediction models for durability of timber construction. The 5th World Conference on Timber Engineering, 2, 2-10.
|
|
[5]
|
Leicester, R.H. and Foliente, G.C. (1999) Models for timber decay and termite attack. Durability of Building Materials and Components, 1, 756-765.
|
|
[6]
|
Foliente, G.C., Leicester, R.H., Wang, C.-H., et al. (2002) Durability design for wood construction. Forest Products Journal, 52, 10-19.
|
|
[7]
|
Leicester, R.H., Wang, C.-H. and Cookson, L.J. (2008) A reliability model for assessing the risk of termite attack on housing in Australia. Reliability Engineering and System Safety, 93, 468-475.
http://dx.doi.org/10.1016/j.ress.2006.12.016 [Google Scholar] [CrossRef]
|
|
[8]
|
Nguyen, M.N., Leicester, R.H., Wang, C.-H., et al. (2008) Probabilistic procedure for design of untreated timber piles under marine borer attack. Reliability Engineering and System Safety, 93, 482-488.
http://dx.doi.org/10.1016/j.ress.2006.12.012 [Google Scholar] [CrossRef]
|
|
[9]
|
Wang, C.-H., Leicester, R.H. and Nguyen, M. (2008) Probabil-istic procedure for design of untreated timber poles in-ground under attack of decay fungi. Reliability Engineering and System Safety, 93, 476-481.
http://dx.doi.org/10.1016/j.ress.2006.12.007 [Google Scholar] [CrossRef]
|
|
[10]
|
杨忠, 江泽慧, 费本华 (2006) 木材初期腐朽研究综述. 林业科学, 3, 99-103.
|
|
[11]
|
杨忠, 江泽慧, 任海青, 等 (2007) 木材加速腐朽试验方法的研究. 木材工业, 4, 12-14.
|
|
[12]
|
Leicester, R..H., Wang, C.-H., Nguyen, M., et al. (2005) Engineering models for biological attack on timber structures. 10DBMC International Conference on Durability of Building Materials and Components, Lyon, 17-20 April 2005, TT4-217.
|
|
[13]
|
Leicester, R.H., Wang, C.-H., Nguyen, M.N., et al. (2003) An engineering model for the decay of timber in ground contact. Proceedings of the 34th IRGWP Annual Meeting, Brisbane, 2, 19-23.
|
|
[14]
|
Leicester, R.H., Wang, C.-H., Nguyen, M., Thornton, et al. (2004) Structural durability of exposed timber. Proceedings of 8th World Conference on Timber Engineering, Lahti, 14-17 June 2004, 571-576.
|
|
[15]
|
李铁英 (2004) 应县木塔现状结构残损要点及机理分析. 硕士论文, 太原理工大学, 太原.
|
|
[16]
|
Leicester, R.H., Wang, C.-H. and Cookson, L.J. (2003) A risk model for termite attack in Australia. The 34th IRGWP Annual Meeting, Brisbane, 2003, NO. IRG/WP/03.
|
|
[17]
|
Leicester, R.H., Wang, C.-H. and Cookson, L. (2004) A probabilistic model for termite attack. Proceedings of 8th World Conference on Timber Engineering, Lahti, 14-17 June 2004, 201-204.
|