|
[1]
|
中交第一公路勘察设计研究院. 公路桥梁加固设计规范(JTG/T J22-2008) [S]. 北京: 人民交通出版社, 2008.
|
|
[2]
|
韩金豹. 大跨混凝土连续箱型桥梁整体顶升关键技术研究[D]: [硕士学位论文]. 上海: 同济大学, 2012.
|
|
[3]
|
蒋岩峰, 蓝戊已. 桥梁整体顶升关键技术研究[J]. 建筑结构, 2007, 37(S1): 547-549.
|
|
[4]
|
蓝戊己, 张志军, 顾远生, 等. 南浦大桥东主引桥整体同步顶升工程[J]. 城市道桥与防洪, 2009(10): 22-25, 135.
|
|
[5]
|
白云, 沈水龙. 建(构)筑物移位技术[M]. 北京: 中国建筑工业出版社, 2006.
|
|
[6]
|
Nai, D.G., Van Lam, N. and Duc, D.V. (2003) Re-search and Application of Bridge Beam Raising Technology by Force Resistance Steel Pipes to Replace Bearing in Normal Traffic Conditions. Proceedings of the Eastern Asia Society for Transportation Studies, 4, 1779-1786.
|
|
[7]
|
Seo, J., Yoo, W.S., Lee, U.K., Kim, C., Kang, K.I. and Cho, H. (2010) Case Study of a Synchronous Hydraulic Jack-Up System for Constructing High-Rise Residential Buildings. Canadian Journal of Civil Engineering, 37, 922- 926. http://dx.doi.org/10.1139/L10-026 [Google Scholar] [CrossRef]
|
|
[8]
|
Tan, X.M., Li, J. and Lu, C. (2003) Structural Behaviour Prediction for Jack-Up Units during Jacking Operations. Computers & Structures, 81, 2409-2416. http://dx.doi.org/10.1016/S0045-7949(03)00299-2 [Google Scholar] [CrossRef]
|
|
[9]
|
Li, F.Y., Wu, P.F. and Yan, X.F. (2015) Analysis and Monitoring on Jacking Construction of Continuous Box Girder Bridge. Computers and Concrete, 16, 49-65. http://dx.doi.org/10.12989/cac.2015.16.1.049 [Google Scholar] [CrossRef]
|
|
[10]
|
金恩. 大跨径连续梁桥顶升过程中的桥墩受力分析[J]. 中国市政工程, 2011(2): 75-77.
|
|
[11]
|
上海市城市建设设计研究院. 同三国道跨横潦泾大桥改造工程设计图纸[Z], 2010.
|