600 MW机组间接空冷系统运行优化
600 MW Plant Indirect Air Cooling System Operation Optimization
DOI: 10.12677/JEE.2018.61005, PDF,   
作者: 魏 江, 文 珏:中国大唐集团科学技术研究院有限公司西北分公司,陕西 西安
关键词: 间接空冷防冻措施增设测点Indirect Air-Cooling Tower Frozen Prevention Measures Additional Measurement Points
摘要: 西北区域近年来间接空冷投运较多,间接空冷机组因防冻措施及现场测点问题造成现场发生空冷散热器损坏事故时有发生,给电厂带来严重的经济损失,本文从防冻逻辑和防冻增设温度测点两个方面入手对间接空冷防冻进行了研究,优化了现场实际的防冻措施,提高了机组安全稳定运行的可靠性。
Abstract: More indirect air cooling systems put into operation in northwest China in recent year. The accident of air cooling radiator in the field often happens, which brings serious economic loss to the power plant. The mean reasons of this are anti freezing measures and site measurement. This article starts from the aspects of antifreeze logic and anti-freeze temperature measurement. It studies the indirect air-cooling and antifreeze, optimizes the actual antifreeze measures on site, and improves the reliability of the unit's safe and stable operation.
文章引用:魏江, 文珏. 600 MW机组间接空冷系统运行优化[J]. 电气工程, 2018, 6(1): 33-37. https://doi.org/10.12677/JEE.2018.61005

参考文献

[1] 石磊, 石诚, 余喆, 等. 间接空冷散热器空冷塔流动和传热的数值研究[J]. 西安建筑科技大学学报(自然科学版), 2011, 43(4): 535-540.
[2] 梁振明, 王平. 国内首例600 MW机组间接空冷示范工程及技术[J]. 中国电力, 2010(3): 31-34.
[3] 朱大宏, 雷平和. 600 MW直接空冷凝汽器的度夏与防冻能力探讨[J]. 电力建设, 2006, 27(9): 33-36.
[4] 赵顺安, 徐铭, 张宏伟, 等. 自然通风间接空冷塔优化布置的数值模拟研究[J]. 水动力学研究与进展, 2013, 28(2): 197-202.