Q/SY 1002.1标准要求与长输管道施工项目HSE工作的融合
The Fusion of Q/SY 1002.1 Standard Requirements with HSE Work of Long-distance Pipeline Construction Project
DOI: 10.12677/JOGT.2018.403047, PDF,   
作者: 李建国:中国石油管道局工程有限公司第四分公司,河北 廊坊
关键词: Q/SY 1002.1长输管道施工项目HSE工作Q/SY 1002.1 Long-distance Pipeline Construction Project HSE Work
摘要: 围绕《健康、安全与环境管理体系第1部分:规范》(Q/SY 1002.1—2013)要求,运用“策划–实施–检查–改进”(PDCA)模式,从投标期、准备期、施工期、收尾期4个阶段,研究了长输管道施工项目在不同时期需要开展的HSE(health、safety、environmen)管理工作。
Abstract: Based on the specifications in the first part of the health, safety and environmental management system (Q/SY 1002.1—2013), the mode of “Plan-do-check-action” (PDCA) was used; the HSE management of long-distance pipeline construction projects at different stages was studied from the four stages of bidding period, preparation period, construction period and finishing period.
文章引用:李建国. Q/SY 1002.1标准要求与长输管道施工项目HSE工作的融合[J]. 石油天然气学报, 2018, 40(3): 14-20. https://doi.org/10.12677/JOGT.2018.403047

参考文献

[1] Q/SY 1002.1—2013. 健康、安全与环境管理体系第1部分[S].
[2] 李建国. 长输管道项目施工HSE管理之准备期工作探讨[J]. 石油工程建设, 2012, 38(3): 75-76.