Q/SY 1002.1标准要求与长输管道施工项目HSE工作的融合
The Fusion of Q/SY 1002.1 Standard Requirements with HSE Work of Long-distance Pipeline Construction Project
摘要:
围绕《健康、安全与环境管理体系第1部分:规范》(Q/SY 1002.1—2013)要求,运用“策划–实施–检查–改进”(PDCA)模式,从投标期、准备期、施工期、收尾期4个阶段,研究了长输管道施工项目在不同时期需要开展的HSE(health、safety、environmen)管理工作。
Abstract:
Based on the specifications in the first part of the health, safety and environmental management system (Q/SY 1002.1—2013), the mode of “Plan-do-check-action” (PDCA) was used; the HSE management of long-distance pipeline construction projects at different stages was studied from the four stages of bidding period, preparation period, construction period and finishing period.
参考文献
|
[1]
|
Q/SY 1002.1—2013. 健康、安全与环境管理体系第1部分[S].
|
|
[2]
|
李建国. 长输管道项目施工HSE管理之准备期工作探讨[J]. 石油工程建设, 2012, 38(3): 75-76.
|