浅析某抽水蓄能电站尾闸洞锚索荷载监测成果
Analysis on Load Monitoring Results of Anchor Cable in Tailrace of a Pumped Storage Power Station
摘要:
本文根据某抽水蓄能电站尾闸洞锚索测力计监测数据,结合地质情况分析锚索荷载变化情况和规律,并对比其他工程锚索变化规律,提出尾闸洞锚索位置应进行针对性详查的建议,以便进一步采取工程措施。
Abstract:
According to a pumped storage power station tailrace tunnel anchor monitoring data and the geological condition, the change of anchor load and the law are analyzed by comparing other en-gineering anchor changes. It is suggested that the position of anchor cable should be checked once, in order to take further action.
参考文献
|
[1]
|
南京水利科学研究院勘测设计院. 岩土工程安全监测手册[M]. 北京: 中国水利水电出版社, 2008.
|
|
[2]
|
林金洪. 抽水蓄能电站主要工程地质问题探讨l [J]. 水力发电, 2013(5): 24-26.
|
|
[3]
|
刘康和, 等. 平原水库塑性混凝土防渗墙探地雷达检测[J]. 水力水电工程设计, 2013(2): 42-45.
|