大断面复用顺槽耦合让压支护技术研究
Research on Coupling Yieldable Support Technology in Large-Section Reuse Gate Roadway
摘要: 文章针对长平煤业有限责任公司大断面复用顺槽出现的围岩变形大,且返修后仍不能有效控制巷道稳定的支护难题,采用耦合让均压锚杆与锚索支护系统在43142巷进行了支护试验。试验巷道选用高强让均压应力显示锚杆和耦合让压锚索,设计安装载荷分别为40 kN和120 kN。工业性实验后知:试验巷道顶板下沉量最大值180 mm,两帮移近量最大值495 mm,最大底鼓量600 mm。通过安装高强度、高预紧力耦合让均压锚杆和耦合让压锚索支护系统能适应大断面复用顺槽的支护要求,实现了43142巷的一次支护成功。
Abstract: In view of acute distortion of slant road surrounding rock during large-section reuse gate roadway and poor stability of overhauled tunnel in Changping Coal Limited Liability Company, an experiment with yieldable bolt and cable bolt support system was carried out in tunnel 43142. In the experiment, high strength yieldable bolts and coupling yieldable anchor cables were deployed, the prestress of anchor bolts and anchor cables was designed to be 40 kN and 120 kN respectively. The monitoring data showed that the maximal close displacement of the two sides was 495 mm and the maximal of the floor heave was 600 mm. The results showed that a successful support in tunnel 43142 was achieved by enhancing high strength prestress yieldable of the support system.
文章引用:陈东印. 大断面复用顺槽耦合让压支护技术研究[J]. 矿山工程, 2018, 6(3): 147-155. https://doi.org/10.12677/ME.2018.63020

参考文献

[1] 于斌. 高强度锚杆支护系统及在大断面煤巷中的应用[J]. 煤炭科学技术, 2011, 39(8) :5-8 + 18.
[2] 王金华. 全煤巷锚杆锚索联合支护机理与效果分析[J]. 煤炭学报, 2012, 37(1): 1-7.
[3] 王亚杰. 深井高地压、大位移围岩巷道支护技术及锚杆设计[J]. 煤矿支护, 2008(1): 8-18.
[4] 连传杰, 韦立德, 王阁. 高预应力让压锚杆数值模拟方法研究[J]. 岩土工程学报, 2008, 30(10): 1437-1443.
[5] 黄宝田, 陈东印. 高应力巷道高强让压锚杆支护系统试验研究[J]. 煤炭科学技术, 2013, 41(8): 49-52.
[6] 霍丽萍. 端锚锚杆对巷道围岩的支护作用分析[J]. 矿山压力与顶板控制, 2002, 19(2): 62-63.
[7] 于洋, 朱琪, 王襄禹. 大断面下山煤巷围岩稳定性控制技术[J].煤炭科学技术, 2011, 39(3): 1-2.