轿子山煤矿8201工作面水害治理及水闸墙设计
Water Hazard Control and Sluice Wall Design for 8201 Working Face of Jiaozishan Coal Mine
DOI: 10.12677/ME.2018.64030, PDF,   
作者: 翟 勇:永贵能源开发有限责任公司,贵州 贵阳
关键词: 工作面水闸墙设计水害治理Working Face Sluice Wall Design Water Hazard Control
摘要: 水害是我国煤矿五大自然灾害之一,严重制约着煤炭工业的健康发展。本文根据轿子山煤矿8201工作面实际情况,在分析其水文地质条件、矿井涌水量状况下,制定工作面水害治理的方案及水闸墙相关的设计,通过实践检验,其堵水取得了预期的效果,为相似矿井的水害防治提供了有力的技术借鉴。
Abstract: Water disaster is one of the five natural disasters in China’s coal mines, which seriously restricts the healthy development of the coal industry. According to the actual situation of 8201 working face in Jiaozishan Coal Mine, this paper analyzes its hydrogeological conditions and mine water inflow, formulates the scheme of water hazard control in working face and the related design of sluice wall. Through practical test, the anticipated effect of water plugging has been achieved, which provides a powerful technical reference for similar mine water hazard control.
文章引用:翟勇. 轿子山煤矿8201工作面水害治理及水闸墙设计[J]. 矿山工程, 2018, 6(4): 224-230. https://doi.org/10.12677/ME.2018.64030

参考文献

[1] 谢和平, 王金华, 申宝宏, 等. 煤炭开采新理念——科学开采与科学产能[J]. 煤炭学报, 2012, 37(7): 1069-1079.
[2] 隋旺华, 杭远. 煤矿水闸墙设计施工技术综述与展望[J]. 煤炭科学技术, 2016, 44(8): 7-13.
[3] Garrett, W. and Campbell, L. (1958) Tests on an Experimental Underground Bulkhead for High Pressures. Journal of South African Institute of Mining and Metallurgy, 59, 123-143.
[4] Harteis, S.P., Dolinar, D.R. and Taylor, T.M. (2008) Guidelines for Permitting, Construction, and Monitoring of Re-tention Bulkheads in Underground Coal Mines. IC9506DHHSPB No. 2008-134.
[5] 国家煤矿安全监察局. 煤矿防治水细则[M]. 北京: 煤炭工业出版社, 2018: 80.
[6] 张荣立, 何国纬, 李铎, 主编. 采矿工程设计手册[M]. 北京: 煤炭工业出版社, 2003: 2495.
[7] 王君现. 隔离开采技术在煤矿防治水工作中的探索与应用[J]. 煤炭与化工, 2015, 38(9): 120-121, 126.
[8] 庞迎春. 杨庄煤矿水闸墙设计与施工[J]. 煤炭技术, 2006, 25(9): 92-94.
[9] 中国煤炭建设协会. GB 50215-2005煤炭工业矿井设计规范[S]. 北京: 中国计划出版社, 2006-01-01.
[10] 中国煤炭建设协会. GB 50416-2007煤矿井底车场硐室设计规范[S]. 北京: 中国计划出版社, 2007-05-21.