石灰法工艺对含油废水预处理的研究
Study on Pretreatment of Oily Wastewater by Lime Process
摘要:
以大连某油脂加工厂产生的实际油脂废水为研究对象,采用石灰法对含油废水进行预处理,当系统内只加入石灰时,除磷效率可达98%左右,石灰投加量为50 g/L,出水pH值约为8.1,电导率约为39.6 ms/cm,同时也可以去除25%的COD。当调节原水pH值为3.0,在石灰投加量为23 g/L,恒速搅拌50 min,静沉20 min的条件下,磷的去除率可保持在95%以上,COD的去除率为21.2%~27.5%,电导率为50 ms/cm左右,出水稳定在9.0以下,不影响后续生化处理。
Abstract:
Taking the actual oil and fat wastewater generated by a grease processing plant in Dalian as the research object, the lime oil method was used to pretreat the oily wastewater. When only lime was added to the system, the phosphorus removal efficiency could reach 98%, and the lime dosage was 50 g/L. The effluent has a pH of about 8.1, a conductivity of about 39.6 ms/cm, and a 25% COD re-moval. When the pH value of raw water is adjusted to 3.0, the removal rate of phosphorus can be kept above 95% and the removal rate of COD is 21.2%~27.5% under the condition of lime dosage of 23 g/L, constant stirring for 50 min and static sinking for 20 min. The conductance is about 50 ms/cm, and the effluent is stable below 9.0, which do not affect the subsequent biochemical treatment.
参考文献
|
[1]
|
张磊. 油脂工业废水处理工艺研究趋向分析[J]. 生物技术世界, 2012, 53(4): 20-22.
|
|
[2]
|
刘玉兰, 汪学德. 油脂生产废水的产生于研究[J]. 中国油脂, 2013, 28(7): 32-35.
|
|
[3]
|
刘妮妮, 昆元. 油脂废水的处理技术[J]. 中国油脂, 2003, 28(5): 80-82.
|
|
[4]
|
郭国立, 谢红. 植物油脂工业废水处理工艺研究[J]. 环保论坛, 2009(9): 380-382.
|
|
[5]
|
高廷耀, 顾国维. 水污染控制工程[M]. 北京: 高等教育出版社.
|
|
[6]
|
Moutin, T., Gal, J.Y., El Halouani, H., et al. (1992) Decrease of Phosphate Concentration in a High Rate Bond by Precipitation of Calcium Phosphate: Theoretical and Experimental Results. Water Research, 26, 1445-1450. [Google Scholar] [CrossRef]
|
|
[7]
|
刘精今, 陈竹新. 植物油脂废水预处理技术[J]. 中国油脂, 2001, 26(3): 9-10.
|
|
[8]
|
宋海云. 植物油脂生产废水处理工程设计与运行[J]. 广东化工. 2015, 42(31): 137-139.
|
|
[9]
|
李长江, 郭一令, 等. 高浓度含磷废水治理工艺研究[J]. 环境科学与管理, 2005, 30(5): 61-63.
|
|
[10]
|
姚晓然. 超高含磷制药废水预处理工艺研究[D]: [硕士学位论文]. 哈尔滨: 哈尔滨工业大学, 2013.
|
|
[11]
|
林冲, 李娜, 等. 复合钙盐法回收高浓度含磷制药废水中的磷[J]. 化工学报, 2009, 60(9): 2346-2350.
|