雅砻江梯级电站发电优化调度研究
Optimal Operation of Yalong River’s Cascade Reservoirs
DOI: 10.12677/JWRR.2019.82013, PDF,  被引量    国家科技经费支持
作者: 邓乐乐, 郭生练, 何绍坤, 张剑亭, 陈柯兵, 巴欢欢:武汉大学水资源与水电工程科学国家重点实验室,湖北 武汉
关键词: 梯级水库优化调度发电量DPSA-POA算法雅砻江Cascade Reservoirs Optimal Operation Power Generation DPSA-POA Algorithm Yalong River
摘要: 以雅砻江梯级电站发电量最大为目标,综合考虑各约束条件,建立梯级水库发电调度模型,采用逐次渐近动态规划–逐次优化混合算法(DPSA-POA)进行求解。研究结果表明:联合优化调度与常规调度方案对比,两河口、锦屏一级、二滩电站的年均发电量分别提高了4.5亿kW•h (4.14%)、20.14亿kW•h (10.67%)和19.39亿kW•h (11.46%);雅砻江梯级水库的年弃水量减少了65.91亿m3,联合优化调度的经济效益巨大。
Abstract: The joint operation model of cascade reservoirs in the Yalong River is established with objective func-tions to maximize power generation, and solved by mixed DPSA-POA algorithm with constraints. Com-pared with the conventional operation scheme, the mid-long term joint optimal operation of cascade reservoirs can increase annual hydropower power generation in Lianghekou, Jinping-I, Ertan by 0.450 (or 4.14%), 2.014 (or 10.67%), 1.939 billion kW•h (or 11.46%), respectively. Meanwhile, it can reduce 6.591 billion m3 (or 57.49%) spillway discharge annually. Application results show that optimal cascade operation can enhance power generation substantially, as well as advancing economic benefit for Yalong River.
文章引用:邓乐乐, 郭生练, 何绍坤, 张剑亭, 陈柯兵, 巴欢欢. 雅砻江梯级电站发电优化调度研究[J]. 水资源研究, 2019, 8(2): 109-116. https://doi.org/10.12677/JWRR.2019.82013

参考文献

[1] ZHOU, Y., GUO, S., et al. Boosting hydropower output of mega cascade reservoirs using an evolutionary algorithm with successive approximation. Applied Energy, 2018, 228: 1726-1739.[CrossRef
[2] APICHONNABUTR, W., TIWARY, A. Trade-offs between economic and environmental performance of an autonomous hybrid energy system using micro hydro. Applied Energy, 2018, 226: 891-904.[CrossRef
[3] 中华人民共和国水利部. 2017年全国水利发展统计公报[R]. 2018. Ministry of Water Resources, People’s Republic of China. 2017 Statistic bulletin on China water activities. 2018.
[4] CHENG, C. T., SHEN, J. J., WU, X. Y., et al. Operation challenges for fast-growing China’s hydropower systems and despondence to energy saving and emission reduction. Renewable & Sustainable Energy Reviews, 2012, 16(5): 2386-2393. [Google Scholar] [CrossRef
[5] CHEN, J., GUO, S., LI, Y., et al. Joint operation and dynamic control of flood limiting water levels for cascade reservoirs. Water Resources Management, 2013, 27(3): 749-763. [Google Scholar] [CrossRef
[6] 冯仲恺, 廖胜利, 程春田, 等. 库群长期优化调度的正交逐步优化算法[J]. 水利学报, 2014, 45(8): 903-911. FENG Zhongkai, LIAO Shengli, CHENG Chuntian, et al. Orthogonal progressive optimal algorithm for long-term optimal operation of multi-reservoir system. Journal of Hydraulic Engineering, 2014, 45(8): 903-911. (in Chinese)
[7] 张诚, 周建中, 王超, 等. 梯级水电站优化调度的变阶段逐步优化算法[J]. 水力发电学报, 2016, 35(4): 12-21. ZHANG Cheng, ZHOU Jianzhong, WANG Chao, et al. Variable period progressive optimality algorithm for optimal dispatch of cascade reservoirs. Journal of Hydroelectric Engineering, 2016, 35(4): 12-21. (in Chinese)
[8] 赵志鹏, 廖胜利, 程春田, 等. 梯级水电站群中长期优化调度的离散梯度逐步优化算法[J]. 水利学报, 2018, 49(10): 61-71. ZHAO Zhipeng, LIAO Shengli, CHENG Chuntian, et al. Discrete gradient progressive optimality algorithm for mid-long-term optimal operation of multi-reservoir system. Journal of Hydroelectric Engineering, 2018, 49(10): 61-71. (in Chi-nese)
[9] ZHANG, W. J., HAO, L. U., YUAN, X. F. Study on the model of short-term cascade hydropower optimization based on energy-conservation power generation dispatch. Electrical Measurement & Instrumentation, 2013.
[10] 黄炜斌, 马光文, 王和康, 唐明, 王立明. 雅砻江下游梯级电站群中长期优化调度模型及其算法研究[J]. 水力发电学报, 2009, 28(1): 1-4. HUANG Weibin, MA Guangwen, WANG Hekang, TANG Ming, WANG Liming. Study on the mid-long-term optimal operation model and its algorithm for cascade hydropower stations on the lower-reach of Yalong River. Journal of Hydroelectric Engineering, 2009, 28(1): 1-4. (in Chinese)
[11] 孙晓懿, 黄强, 康田, 等. 汉江上游梯级水电站水库优化运行研究[J]. 西安理工大学学报, 2011, 27(3). SUN Xiaoyi, HUANG Qiang, KANG Tian, et al. Optimized operation of the cascade power station reservoirs in the upper reaches of the Hanjiang river. Journal of Xi’an University of Technology, 2011, 27(3). (in Chinese)
[12] 刘新, 纪昌明, 杨子俊, 等. 基于逐步优化算法的梯级水电站中长期优化调度[J]. 人民长江, 2010, 41(21). LIU Xin, JI Changming, YANG Zijun, et al. Study on mid-long term optimal dispatching of cascade hydropower stations based on progressive optimality algorithm. Yangtze River, 2010, 41(21). (in Chinese)