交通–电力暗挖隧道共建方案优化研究
Optimization on Co-Construction Scheme of the Traffic and Power Tunnel
摘要:
结合重庆同茂大道金竹湾市政交通隧道与电力隧道共建工程,在理论分析的基础上,针对提出的两种施工方案,建立二维有限元模型,对其交通–电力隧道共建方案下围岩的塑性区半径、弹塑性交界处的应力以及弹塑性位移进行对比分析,提出较佳的共建方案。
Abstract:
Based on the theoretical analysis of the Jinzhuwan municipal traffic tunnel and power tunnel co-construction project of Tongmao Avenue in Chongqing, a two-dimensional finite element model is established for the proposed two construction schemes, and the traffic-electricity tunnel co-construction scheme is selected. The plastic zone radius of the rock, the stress at the elastoplastic interface and the elastoplastic displacement are compared and analyzed, and a better co-construction scheme is proposed.
参考文献
|
[1]
|
张晓军. 隧道净距离上下交叠设计施工处治措施[J]. 公路交通技术, 2018, 34(5): 96-101.
|
|
[2]
|
王渭明, 王冲, 秦志斌, 等. 极小净距交叠隧道下行双线施工间距优化研究[J]. 现代隧道技术, 2017(5): 200-209.
|
|
[3]
|
台启民, 张顶立, 房倩, 等. 暗挖重叠地铁隧道地表变形特性分析[J]. 岩石力学与工程学报, 2014, 33(12): 2472-2480.
|
|
[4]
|
梅勇文. 明挖法施工城市隧道与综合管廊共建技术探讨[J]. 北方交通, 2018(6): 138-142.
|
|
[5]
|
阚绍德. 电力隧道工程与地铁工程共建设计浅析[J]. 广东土木与建筑, 2014(12): 53-55.
|