岩溶区建筑桩基施工勘察方案优化
Optimization of Investigation for Pile Foundation Construction
DOI: 10.12677/HJCE.2019.83086, PDF,    科研立项经费支持
作者: 曹贤发, 李海玲:桂林理工大学,土木与建筑工程学院,广西 桂林
关键词: 岩溶岩溶强发育深度桩基施工勘察Karst Depth of Intensity Karstification Investigation for Pile of Construction
摘要: 针对目前岩溶建筑桩基施工勘察的主要问题,提出了以岩溶强发育深度作为桩基施工勘察钻孔最小深度控制标准的施工勘察优化方案。结果表明:一桩多孔方案虽可有效解决施工勘察深度不足的问题,但其经济合理性值得商榷;若所有钻孔均进入岩溶强发育层以下一定深度范围,同时满足钻孔底部完整岩厚度大于3倍桩径且不小于5 m的要求时,则一桩一孔方案具有很好的技术可行性,也能取得良好的经济效益。
Abstract: The optimization of investigation for pile foundation construction is proposed, in which the depth of intensity karstification becomes the criterion for determining borehole depth. Results show that, one pile with several boreholes can effectively solve the problem of insufficient depth in pile con-struction investigation, but the economical rationality is arguable. If all boreholes exceed certain depth range of intensity karstification, and intact rock over 5 m below pile tip is no less than three times the thickness of pile diameter, the optimization scheme of one-pile-with-one-borehole is tech-nically feasible, and the economic benefits are also rational.
文章引用:曹贤发, 李海玲. 岩溶区建筑桩基施工勘察方案优化[J]. 土木工程, 2019, 8(3): 735-741. https://doi.org/10.12677/HJCE.2019.83086

参考文献

[1] 王晓楠, 张燕奇, 王建良. 桥梁基桩下伏溶洞围岩应力状态分析[J]. 科学技术与工程, 2012, 12(14): 3390-3393+341010.
[2] Estrada-Medina, H., Tuttle, W., Graham, R.C., Allend, M.F. and Jiménez-Osornio, J.J. (2010) Identification of Underground Karst Features Using Ground-Penetrating Radar in Northern Yucatán, México. Vadose Zone Journal, 9, 653-661. [Google Scholar] [CrossRef
[3] Debeglia, N. and Dupont, F. (2002) Some Critical Factors for Engineering and Environmental Microgravity Investigations. Journal of Applied Geophysics, 2002, 435-454. [Google Scholar] [CrossRef
[4] Youssef, A.M., El-Kaliouby, H. and Zabramawi, Y.A. (2012) Sinkhole Detection Using Electrical Resistivity Tomography in Saudi Arabia. Journal of Geophysics and Engineering, 9, 655-663. [Google Scholar] [CrossRef
[5] 姚伟, 李文尧, 张文杰. 高密度电阻率法和探地雷达在昆明长水国际机场岩溶勘查中的应用[J]. 科学技术与工程, 2012, 12(31): 8175-8179.
[6] Zhao, J.B., Chen, B.Q., Yue, Y.L. and Juan, D. (2006) Karst Subzone Division in Vertical Cycle Zone and Its Significance. Geographical Sciences, 16, 472-478. [Google Scholar] [CrossRef
[7] 周文生, 汪玉松, 陈国栋, 等. 江西省武山铜矿岩溶发育规律及影响因素研究[J]. 中国地质灾害与防治学报, 2008, 19(2): 124-127.
[8] 郭长宝, 郭书泰, 彭涛, 等. 辽宁省大窑湾某建筑场地岩溶发育特征及工程地质条件评价[J]. 中国岩溶, 2010, 29(2): 176-182.
[9] 王启国, 林仕祥, 吴树良, 等. 汉江崔家营航电枢纽坝基隐伏岩溶问题研究[J]. 岩土工程学报, 2010, 32(11): 1772-1779.
[10] 曹贤发, 张家生, 刘之葵, 等. 岩溶建筑地基溶蚀程度及深度分布规律[J]. 中南大学学报(自然科学版), 2014, 45(8): 2787-2792.
[11] 曹贤发, 张家生, 刘之葵, 等. 溶蚀程度随高程分布特征的定量分析方法[J]. 中南大学学报(自然科学版), 2014, 45(7): 2339-2345.
[12] 刘宏, 赵跃平, 邬相国, 等. 强溶蚀带岩溶地基稳定性研究[J]. 矿业研究与开发, 2011, 31(3): 35-39.